Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-20 <br /> <br /> <br />4.4.1.3. Impact CUL-3 <br />As previously summarized, Native American contacts identified by the NAHC were sent an invitation to <br />consult via email on July 2, 2025, consistent with the requirements of SPR CUL-2. To date, responses have <br />been received from the Confederated Villages of Lisjan Nation, Tamien Nation, Wilton Rancheria, the <br />Ohlone Indian Tribe, and the Costanoan Rumsen Carmel Tribe. The potential for treatment activities to <br />cause a substantial adverse change in the significance of a Tribal cultural resource was examined in the <br />PEIR. Proposed treatment activities include manual and mechanical treatment activities that may require <br />ground disturbance, as well as the use of herbicides, which may adversely affect ethnobotanicals or <br />material culture that may have Tribal importance. The potential for the proposed treatment activities to <br />cause a substantial adverse change in the significance of a Tribal cultural resource during vegetation <br />treatment was examined in the PEIR and found to be less than significant with the implementation of SPR <br />CUL-6. As planning proceeds, additional information provided by Tribes during the consultation process <br />may identify the potential for a substantial adverse change to a Tribal cultural resource to result from <br />project-related actions, and measures to protect the resource shall be formulated consistent with SPR CUL- <br />6, which, upon implementation, would avoid any substantial adverse change to any Tribal cultural <br />resource. The potential for adverse effects on Tribal cultural resources during implementation of the <br />proposed project is within the scope of the activities and impacts addressed in the PEIR because the <br />treatment activities and intensity of ground disturbance are consistent with those analyzed in the PEIR. <br />SPRs applicable to this treatment are CUL-1 through CUL-6 and CUL-8. SPRs CUL-1 through CUL-4 have <br />been conducted during preparation of this PSA. SPR CUL-5 and CUL-6 require consulting with the <br />geographically affiliated Tribes to avoid and protect any resources identified, and SPR CUL-8 requires <br />worker training regarding the protection of sensitive archaeological, historical, and Tribal cultural <br />resources. <br />The inclusion of land that is outside the CalVTP treatable landscape in the proposed treatment area <br />constitutes a change to the geographic extent presented in the PEIR. However, within the boundary of the <br />project area, the potential for tribal cultural resources present in the areas outside the treatable landscape <br />are essentially the same as those within the treatable landscape; therefore, the potential impact to Tribal <br />cultural resources is also the same, as described above. This impact of the proposed project is consistent <br />with the PEIR and would not constitute a substantially more severe significant impact than what was <br />covered in the PEIR. <br />4.4.1.4. Impact CUL-4 <br />Vegetation treatment activities would include mechanical treatments that use heavy equipment that could <br />result in ground disturbance as vegetation is removed, which could uncover human remains, if present in <br />a treatment area. The potential for treatment activities to uncover human remains was examined in the