My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-26 <br /> <br /> <br />4.5.1. Discussion <br />4.5.1.1. Impact BIO-1 <br />The Project proposes manual and mechanical vegetation removal, prescribed burning, pile burning, <br />prescribed herbivory, and targeted herbicide application. These treatment activities could result in direct <br />or indirect adverse effects to special-status plant species. Mechanical treatment and herbicide application <br />have potential to impact special-status species directly or indirectly if not strategically applied; however, <br />strategic removal of understory vegetation and invasive species would promote the regeneration of native <br />species that support a healthier residual forest. The Project is designed to reduce the risk of catastrophic <br />stand-replace wildfires, which would threaten known sensitive plant populations. <br />The potential for adverse effects to special-status plant species is within the scope of the activities and <br />impacts addressed in the PEIR because the treatment activities and intensity of disturbance resulting from <br />implementing treatment activities are consistent with those analyzed in the PEIR. Impacts to special-status <br />plants would be reduced to less than significant through following certain SPRs and MMs (Attachment A). <br />In addition to the CalVTP PEIR SPRs and MMs, additional project-specific measures are described below <br />each applicable measure. <br />No special-status plant species have moderate to high potential to occur on the project site. The potential <br />for adverse effects to special-status plant species is within the scope of the activities and impacts <br />addressed in the PEIR because the treatment activities and intensity of disturbance resulting from <br />implementing treatment activities are consistent with those analyzed in the CalVTP PEIR. Impacts to <br />special-status plants would be reduced to less than significant with the following SPRs and MMs. <br />Additional project-specific measures are described below each applicable measure. <br />• SPR AD-2: Delineate Protected Resources for Avoidance <br />• SPR AD-3: Consistency with Local Plans, Policies, and Ordinances <br />• SPR AD-5: Maintain Site Cleanliness <br />• SPR AQ-3: Create Burn Plan <br />o No fire ignition (nor use of associated accelerants) would occur within 50 feet of listed <br />plants <br />• SPR AQ-4: Minimize Dust <br />• SPR BIO-1: Review and Survey Project-Specific Biological Resources and Determine whether <br />Avoidance Is Possible <br />• SPR BIO-2: Require Biological Resource Training for Workers <br />• SPR BIO-3: Survey Sensitive Natural Communities and Other Sensitive Habitats and Map Locations <br />o If any rare plant populations are found, the location, quantity, and description would be <br />reported to the California Natural Diversity Database <br />o Any in-field methods of identification that would require handling would follow proper <br />permitting and protocols
The URL can be used to link to this page
Your browser does not support the video tag.