Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-44 <br /> <br /> <br />4.5.1.4. Impact BIO-4 <br />Aquatic resources were identified within the project footprint as blue-line waters and one pond with an <br />ephemeral drainage flowing into the pond. Initial vegetation and maintenance treatments could result in <br />direct or indirect adverse effects on state- or federally protected wetlands. The potential for adverse <br />effects to wetlands is within the scope of the activities and impacts addressed in the PEIR because the <br />treatment activities and intensity of disturbance resulting from implementing treatment activities are <br />consistent with those analyzed in the PEIR. Impacts to wetlands would be reduced to less than significant <br />with the following SPRs and MMs: <br />• SPR AD-2: Delineate Protected Resources for Avoidance <br />• SPR AD-3: Consistency with Local Plans, Policies, and Ordinances <br />• SPR AD-5: Maintain Site Cleanliness <br />• SPR BIO-9: Prevent Spread of Invasive Plants, Noxious Weeds, and Invasive Wildlife <br />• SPR HAZ-5: Spill Prevention and Response Plan <br />• SPR HAZ-6: Comply with Herbicide Application Regulations <br />• SPR HYD-1: Comply with Water Quality Regulations <br />• SPR HYD-2: Avoid Construction of New Roads <br />• SPR HYD-3: Water Quality Protections for Prescribed Herbivory <br />• SPR HYD-4: Identify and Protect Watercourse and Lake Protection Zones <br />• SPR HYD-5: Protect Non-Target Vegetation and Special-Status Species from Herbicides <br />The aquatic habitat in the vicinity of the project area has been excluded from the project area during <br />design of the treatments, and riparian habitat would be avoided at a minimum standard 50-foot buffer. <br />Implementation of water quality protections in accordance with SPR HYD-1, identification of Watercourse <br />and Lake Protection Zones (WLPZs), and establishing no-work buffers in accordance with SPR HYD-4 and <br />SPR BIO-9 would minimize potential for invasive species spread in protected wetlands and riparian areas. <br />With implementation of the SPRs described above, impacts to state- and federally protected wetlands and <br />riparian corridors from the treatment project would be less than significant with mitigation incorporated. <br />• MM BIO-4: Avoid State and Federally Protected Wetlands <br />Even following the above SPRs, project impacts could still be considered potentially significant. Therefore, <br />MM BIO-4 would be implemented. Avoidance of state- and federally protected wetlands, per MM BIO-4, <br />would ensure no impacts to wetlands in the identified features. With implementation of the above listed <br />SPRs and MMs, riparian habitat and sensitive natural communities would be retained. These impacts were <br />found to be within the scope of the PEIR, and treatment activities proposed are consistent with those <br />analyzed in the PEIR.