Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-47 <br /> <br /> <br />sensitive habitats. Therefore, project treatment would remove vegetation and alter habitat structure <br />locally but would not result in permanent habitat degradation or conversion. <br />The potential for adverse effects on common wildlife, including nesting birds, is within the scope of the <br />PEIR because the treatment activities and extent of expected disturbance as a result of implementing <br />vegetation treatments, including maintenance treatments, are consistent with those analyzed in the PEIR. <br />The implementation of SPRs BIO-1, BIO-2, BIO-3, BIO-5, and BIO-12, in addition to measures described for <br />special-status species under Impact BIO-1, BIO-2, BIO-3, and BIO-5, would reduce the risk of this project, <br />resulting in less than significant adverse effects to habitat and the abundance of common wildlife. <br />The potential for treatment activities, including maintenance treatments, to result in adverse effects on <br />these resources was examined in the PEIR and was found to be less than significant. <br />4.5.1.7. Impact BIO-7 <br />Local policies or ordinances would apply to resources that occur within the proposed project area, <br />particularly tree ordinances or noise ordinances. The potential for treatment activities to result in conflict <br />with local policies or ordinances was examined in the PEIR. The potential for the proposed project to <br />conflict with local policies or ordinances is within the scope of the activities and impacts addressed in the <br />PEIR because the treatment projects implemented under the CalVTP are required to comply with any <br />applicable county, city, or other local policies, ordinances, and permitting procedures related to protection <br />of biological resources. <br />• SPR AD-3: Consistency with Local Plans, Policies, and Ordinances <br />Additionally, SPR AD-3 (Consistency with Local Plans, Policies, and Ordinances) requires that the project <br />proponent design and implement the treatment in a manner that is consistent with applicable local plans <br />(e.g., general plans), policies, and ordinances to the extent the Project is subject to them (see Section <br />3.12.2, Regulatory Setting, in the PEIR for more information). Impacts would be less than significant and <br />consistent with the PEIR. <br />4.5.1.8. Impact BIO-8 <br />The CalVTP recognized eight HCPs and/or NCCPs in the planning or implementation phase in the Central <br />California Coast Section. In addition, the East Bay Municipal Utility District Low Effect East Bay HCP lies <br />within the Central California Coast Section and west of the project area. The proposed project does not <br />fall under the jurisdiction of any known HCPs or NCCPs; therefore, this impact does not apply to the <br />treatment areas.