Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-58 <br /> <br /> <br />4.8. Energy Resources <br />Table 9. Consistency of project-related energy resources impacts with the scope of the California Vegetation Treatment Program Programmatic <br />Environmental Impact Report. <br />Impact in the PEIR Project-Specific Checklist <br />Environmental Impact Covered in <br />the PEIR <br />Identify <br />Impact <br />Significance <br />in the PEIR <br />Identify <br />Location of <br />Impact <br />Analysis in <br />the PEIR <br />Does the <br />Impact <br />Apply to <br />the <br />Treatment <br />Project? <br />List SPRs <br />Applicable <br />to the <br />Treatment <br />Project1 <br />List MMs <br />Applicable <br />to the <br />Treatment <br />Project1 <br />Identify <br />Impact <br />Significance <br />for <br />Treatment <br />Project <br />Would This <br />Be a <br />Substantially <br />More Severe <br />Significant <br />Impact than <br />Identified in <br />the PEIR? <br />Is This <br />Impact <br />within the <br />Scope of <br />the PEIR? <br />Would the project: <br />Impact ENG-1: Result in Wasteful, <br />Inefficient, or Unnecessary <br />Consumption of Energy <br />LTS <br />Impact ENG- <br />1, pp. 3.9-7– <br />3.9-8 <br />Yes NA NA LTS No Yes <br />1NA: Not applicable; there are no SPRs and/or MMs identified in the PEIR for this impact. <br />New Energy Resource Impacts: Would the treatment result in other <br />impacts to energy resources that are not evaluated in the CalVTP PEIR? <br />☐ Yes ☒ No If yes, complete row(s) <br />below and discussion <br />Potentially Significant Less than Significant with <br />Mitigation Incorporated Less than Significant <br />☐ ☐ ☐ <br /> <br />