My WebLink
|
Help
|
About
|
Sign Out
RES 2026024
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 10:24:53 AM
Creation date
4/28/2026 10:13:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(13) Secondary Power Sources. The approval authority may approve secondary <br /> or backup power sources and/or generators on a case-by-case basis. No <br /> permanent diesel generators or other similarly noisy or noxious generators in <br /> or within 250 feet from any residence are permitted absent a showing of <br /> extraordinary need; provided, however, the approval authority may approve <br /> sockets or other connections used for temporary backup generators. <br /> (14) Parking; Access. Any equipment or improvements constructed or installed in <br /> connection with any wireless facilities must not reduce any parking spaces <br /> below the minimum requirement for the subject property. Whenever feasible, <br /> existing parking and access should be used for ingress and egress from new <br /> wireless facilities rather than constructing new parking or access improvements <br /> to access the wireless facility. Any new parking or access improvements should <br /> be the minimum size necessary to reasonably accommodate the proposed use <br /> and comply with applicable safety codes. <br /> (15) Utilities. All cables and connectors for telephone, primary electric and other <br /> similar utilities must be routed underground to the extent feasible in conduits <br /> large enough to accommodate future collocated wireless facilities. To the <br /> extent feasible, undergrounded cables and wires must transition directly into <br /> the pole base without any external doghouse or similar enclosure. Meters, <br /> panels, disconnect switches and other associated improvements must be <br /> placed in inconspicuous locations to the extent possible. No new overhead <br /> utility lines or service drops are permitted merely because compliance with the <br /> undergrounding requirements would increase the project cost. Microwave or <br /> other wireless backhaul is discouraged when it would involve a separate and <br /> non-stealth antenna. <br /> (16) Future Expansion. To the extent feasible and aesthetically desirable, all new <br /> wireless facilities should be designed and sited in a manner that <br /> accommodates potential future collocations and other expansions that can be <br /> integrated into the proposed wireless facility or its associated structures with <br /> no or negligible visual changes to the outward appearance. The approval <br /> authority may waive this requirement when the approval authority determines <br /> future expansions at a proposed wireless facility would be aesthetically <br /> undesirable. <br /> (17) Compliance with Laws. All wireless facilities must be designed and sited in <br /> compliance with all applicable federal, state, regional, and local laws, <br /> regulations, rules, restrictions and conditions, which includes without limitation <br /> the California Building Standards Code, Americans with Disabilities Act, the <br /> general plan and any applicable specific plan, the Municipal Code and any <br /> conditions or restrictions in any permit or other governmental approval issued <br /> by any public agency with jurisdiction over the project. <br /> Wireless Telecommunications Facilities Policy(City of Pleasanton) page 19/37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.