My WebLink
|
Help
|
About
|
Sign Out
RES 2026024
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 10:24:53 AM
Creation date
4/28/2026 10:13:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
structure or the wireless facility and/or its use. The permittee may request in <br /> writing, and the Director may grant in writing, one 12-month extension to the <br /> Build-Out Period if the permittee submits, at least 30 days prior to the automatic <br /> expiration date in this condition, substantial and reliable written evidence <br /> demonstrating justifiable cause for the 12-month extension submitted. If the <br /> Build-Out Period (and any extension) finally expires, this permit shall be <br /> automatically void but the permittee may resubmit a complete application, <br /> which includes without limitation all application fees, for the same or a <br /> substantially similar project. <br /> (7) Pre-Installation Requirements. In addition to obtaining all other permits and <br /> approvals required to install, construct and/or operate the approved wireless <br /> facility, which includes without limitation any permits or approvals required by <br /> any federal, state or local public agencies with jurisdiction over the subject <br /> property, the wireless facility or its use, the permittee shall, prior to <br /> commencement of any installation or construction, attend a pre-grading <br /> meeting with the Public Works Department regarding temporary Best <br /> Management Practices ("BMPs") pertaining to discharges from the <br /> construction site. Before the permittee can proceed with installation or <br /> construction of the approved wireless facility, the Public Works Department <br /> must inspect and approve the permittee's installation of such temporary BMPs. <br /> (8) Post-Installation Certification. Within 60 calendar days after the permittee <br /> commences full, unattended operations at the wireless facility, the permittee <br /> shall provide the Director with documentation reasonably acceptable to the <br /> Director that the wireless facility has been installed and/or constructed in strict <br /> compliance with the Approved Plans. Such documentation shall include, <br /> without limitation, electronic as-built drawings prepared by a California licensed <br /> civil engineer, GIS data, site photographs, and an affirmation, signed by a <br /> California licensed RF engineer, that the installation as constructed and <br /> operated complies with the RF emissions report and any mitigation measures <br /> therein made part of the Approved Plans, as well as all applicable FCC rules <br /> and regulations for human exposure to RF emissions and will not cause <br /> members of the general public to be exposed to RF levels that exceed the <br /> maximum permission exposure levels deemed safe by the FCC. In a written <br /> notice to the permittee, the Director may (but shall not have the obligation to) <br /> certify that the wireless facility complies with the Approved Plans or order the <br /> permittee to correct any noncompliance. <br /> (9) Site Maintenance. The permittee shall keep the site, which includes without <br /> limitation any and all improvements, equipment, structures, access routes, <br /> fences, hardscape and landscape features, in a neat, clean, safe and code <br /> compliant condition in accordance with the Approved Plans and all conditions <br /> in this permit. The permittee shall keep the site area free from all litter and <br /> debris at all times. The permittee shall regularly inspect the site to determine <br /> whether any maintenance is needed. The permittee shall perform any <br /> Wireless Telecommunications Facilities Policy(City of Pleasanton) page 24/37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.