Laserfiche WebLink
required by any federal, state or local public agencies with jurisdiction over the <br /> subject property, the small wireless facility or its use, the permittee shall, prior <br /> to commencement of any installation or construction, attend a pre-grading <br /> meeting with the Public Works Department regarding temporary Best <br /> Management Practices ("BMPs") pertaining to discharges from the <br /> construction site. Before the permittee can proceed with installation or <br /> construction of the approved small wireless facility, the Public Works <br /> Department must inspect and approve the permittee's installation of such <br /> temporary BMPs. <br /> (8) Post-Installation Certification. Within 60 calendar days after the permittee <br /> commences full, unattended operations at the small wireless facility, the <br /> permittee shall provide the Director with documentation reasonably acceptable <br /> to the Director that the small wireless facility has been installed and/or <br /> constructed in strict compliance with the Approved Plans. Such documentation <br /> shall include without limitation electronic as-built drawings prepared by a <br /> California licensed civil engineer, GIS data and site photographs. In a written <br /> notice to the permittee, the Director may (but shall not have the obligation to) <br /> either certify that the small wireless facility complies with the Approved Plans <br /> or order the permittee to correct any noncompliance. <br /> (9) Site Maintenance. The permittee shall keep the site, which includes without <br /> limitation any and all improvements, equipment, structures, access routes, <br /> fences, hardscape and landscape features, in a neat, clean, safe and code <br /> compliant condition in accordance with the Approved Plans and all conditions <br /> in this permit. The permittee shall keep the site area free from all litter and <br /> debris at all times. The permittee shall regularly inspect the site to determine <br /> whether any maintenance is needed. The permittee shall perform any <br /> maintenance requested by the City for compliance with this condition within a <br /> reasonable time specified by the Director in a written notice to the permittee. <br /> Routine maintenance within residential zones shall be restricted to the City's <br /> normal construction work hours specified in the Municipal Code. The permittee, <br /> at no cost to the City, shall remove and remediate any graffiti or other vandalism <br /> at the small wireless facility within 24 hours after the permittee receives notice <br /> or otherwise becomes aware that such graffiti or other vandalism occurred. <br /> (10) Landscape Features. The permittee shall replace any landscape features <br /> damaged or displaced by the construction, installation, operation, maintenance <br /> or other work performed by the permittee or at the permittee's direction on or <br /> about the site. If any trees are damaged or displaced, the permittee shall hire <br /> and pay for a licensed arborist to select plant and maintain replacement <br /> landscaping in an appropriate location for the species. Any replacement tree <br /> must be substantially the same size as the damaged tree or as otherwise <br /> approved by the City. The permittee shall, at all times, be responsible to <br /> maintain any replacement landscape features. <br /> Small Wireless Facilities Policy (City of Pleasanton) page 34/47 <br />