My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 4-21-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 4-21-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 5:04:41 PM
Creation date
4/28/2026 4:58:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
846
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />2-14 <br /> <br /> <br />habitat, or presence of sensitive resources. Refueling of equipment would occur outside these buffers and <br />would be performed using containment to mitigate the risk of spills. <br />2.4. General <br />2.4.1. Timing of Initial Treatment <br />The City would commence initial fuel treatment within the project footprint in April 2026 and would <br />complete the work by the end of 2029. <br />2.4.2. Workers <br />The City and/or subcontractors would conduct all treatment activities. Crew team sizes would vary and <br />would typically be fewer than 25 workers per site, per day. Multiple teams would work at the same time. <br />2.4.3. Site Access <br />Treatment areas would be accessed via existing fire roads and trails. No new roads or access points would <br />be created. The Augustin Bernal Community Park parking lot would be used as the primary access point. <br />Vehicles and equipment would be staged at the contractor’s yard daily or on-site in the park, in <br />coordination with the City. <br />2.4.4. Treatment Schedule and Duration <br />Treatments except herbivory would occur primarily on weekdays during daylight hours only. Prescribed <br />burning will also be limited to the months of November 1 to March 31 during the winter hibernation <br />season for Alameda whipsnake as described in Section 2.2.1 During prescribed burning, crews would need <br />to conduct some maintenance burning on weekends to manage overall smoke impacts. Noise-generating <br />treatments would comply with local regulations. <br />2.5. Pests, Diseases, and Invasive Species <br />Without proper prevention, project treatments have potential to spread pathogens, diseases, pests, or <br />invasive species. SOD, pitch canker (Fusarium circinatum), yellow starthistle (Centaurea solstitialis), French <br />broom (Genista monspessulana), stinkwort (Dittrichia graveolens), and snake fungal disease <br />(Ophidiomyces ophiodiicola) occur in the region and have potential to spread in the project area from one <br />work area to another or from the project area to off-site areas. The goal of reducing invasive plant species <br />within the project area is in conformity with the overall project goals of fuels reduction and wildfire <br />Page 337 of 846
The URL can be used to link to this page
Your browser does not support the video tag.