My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL WORKSHOP AGENDA PACKET 4-21-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 WORKSHOP
>
CITY COUNCIL WORKSHOP AGENDA PACKET 4-21-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 3:35:03 PM
Creation date
4/29/2026 3:34:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 9 <br />service connections. The average dry-weather flow is approximately 6 million gallons per day <br />(MGD). <br /> <br />The City has agreements with DSRSD and the City of Livermore (for the Ruby Hill service <br />area) for wastewater treatment, and is a member of the Livermore-Amador Valley Water <br />Management Agency (LAVWMA) for the disposal of treated wastewater. The City also has an <br />agreement with Alameda County, which allows sewage flows from the County’s Castlewood <br />Service Area to be conveyed through the City’s collection system for treatment at DSRSD. <br /> <br />Historically, the City has relied on Consumer Price Index (CPI) increases to raise sewer <br />revenue. This approach has not generated the resources needed to adequately maintain and <br />rehabilitate aging infrastructure or keep up with increasing operational and regulatory <br />demands. As a result, operating costs have been withdrawing from the sewer enterprise fund <br />balance every year. With aging infrastructure experiencing higher failure rates and increasing <br />regulatory requirements, it is critical that the City establish a justifiable sewer rate that supports <br />the system's critical infrastructure needs in the coming years and meets State regulatory <br />requirements for managing the sanitary sewer system. <br /> <br />On June 17, 2025, the City Council approved the City’s 2025 Sewer System Management Plan <br />(SSMP), a living document required by the State Water Resources Control Board (SWRCB) <br />that provides the framework for managing the sewer program. The SSMP identified the need <br />for the City to establish a complete and comprehensive sewer management program that <br />supports required operations and maintenance (O&M), repair and replacement (R&R), and <br />capital improvement program (CIP) projects to meet the minimum State requirements for <br />effective sewer system management and to maintain compliance with all sanitary sewer <br />regulatory requirements. As required in the SSMP, the City developed a long-term sewer CIP <br />identifying critical infrastructure needs over the next 20 years, which the City Council approved <br />on November 4, 2025. <br /> <br />To support financial sustainability during SSMP implementation, the City retained a utility rate <br />consulting firm, Water Resources Economics, LLC (WRE), to prepare the 2026 Sewer Rate <br />Study. The Rate Study will develop cost-based, fair, and legally defensible sewer rates and <br />connection fees that adequately fund the sewer program. <br /> <br />Rate Study objectives are: <br />• Maintain financial sufficiency for O&M and CIP needs to implement the SSMP through a <br />five-year financial plan (fiscal year (FY) 2026 - FY 2030) <br />• Develop a four-year sewer rate schedule (FY 2027 - FY 2030), with rates effective <br />January 1, 2027, and then July 1 at the start of each subsequent fiscal year <br />• Align collection rates with cost-of-service principles through an updated cost-of-service <br />analysis <br />• Simplify the rate structure to improve transparency and consistency with peer agencies <br />• Develop updated 2027 sewer connection fees, with annual CPI adjustments <br />• Document the rate development process in a formal report. <br />The City Council reviewed three implementation scenarios on February 17, 2026, and adopted <br />Scenario 1 — Maintain, which provides a balanced approach between near-term <br />improvements and long-term risk. Staff was directed to return for a spring workshop to review <br />Page 3 of 27
The URL can be used to link to this page
Your browser does not support the video tag.