Task <br /># <br />Item description Cost Notes <br />1 Project Initiation: <br />DKF will conduct a project kickoff meeting with City of Pleasanton staff to confirm project objectives, <br />roles, expectations, and communication protocols. This task will include confirmation of system <br />characteristics, staffing and operational responsibilities, regulatory oversight, and the proposed project <br />schedule. <br />Phase I is anticipated to be completed within approximately4–6 <br />weeksfollowing notice to proceed, subject to City staff availability and <br />timely access to requested documents. <br />Assumptions and Exclusions: <br />• Phase I does not include drafting of full manual sections or SOPs <br />• Engineering analysis, system modeling, or field sampling are not <br />included <br />•The City will provide reasonable access to staff and relevant <br />documents <br />2 Document and Information Review <br />DKF will review existing City documents and operational materials relevant to water system operations, <br />as provided by the City, which may include: <br />•Existing water operations procedures and SOPs <br />•Emergency Response Plan (ERP) and emergency notification protocols <br />•Cross-Connection Control Program documentation <br />•Water quality monitoring and sampling plans <br />•System maps and asset inventories (for reference purposes) <br />•Safety programs including the Injury and Illness Prevention Program (IIPP), confined space, <br />lockout/tagout, traffic control, and chemical safety <br />•Recent regulatory correspondence, inspections, or audit findings <br />The document review will be used to identify usable content, assess consistency with current practices, <br />and identify procedural gaps. <br />3 Stakeholder Interviews and Operational Walkthroughs <br />DKF will conduct structured interviews and/or operational walkthroughs with designated City personnel, <br />which may include water operations management, distribution system staff, and on-call personnel. <br />These discussions will focus on actual operating practices, emergency and abnormal operations, <br />institutional knowledge, continuity risks, and regulatory or safety challenges encountered during routine <br />operations. <br />4 Regulatory and Risk Scoping <br />DKF will identify and confirm the primary regulatory and operational risk drivers applicable to the City of <br />Pleasanton’s water system, including: <br />• State Water Resources Control Board / Division of Drinking Water requirements <br />• Operator certification and coverage requirements <br />• Water quality monitoring, reporting, and public notification obligations <br />• Applicable Cal/OSHA safety requirements impacting water operations <br />• High-risk operational activities requiring formalized procedures <br />5 Manual Framework and Scope Definition <br />Based on the findings from Tasks 1–4, DKF will develop a recommended framework for the City of <br />Pleasanton Water Operations Manual, including: <br />• A proposed manual outline and organizational structure <br />• Identification of procedures to be developed, updated, or referenced <br />• Recommended level of detail appropriate for Pleasanton operations staff <br />• Coordination points with existing City plans and programs <br />• Identification of optional enhancements for consideration in Phase II <br />6 Phase I Deliverables <br />DKF will provide the following deliverables upon completion of Phase I: <br />1. A Phase I Scoping Memorandum summarizing key findings, risks, and recommendations <br />2. A proposed Water Operations Manual outline tailored to the City of Pleasanton <br />3. A defined scope, schedule, and fee proposal for Phase II – Manual Development <br />11,700$ <br />This Project is anticipated to take 60 hours at $195/hour <br />11,700.00$ <br />7 Manual Structure Development: Finalize manual structure, section organization, and formatting based <br />on Phase I scoping results. <br /> $ 6,000 <br />8 System Overview & Operational Responsibilities: Develop documentation describing Pleasanton’s water <br />sources, storage facilities, distribution system overview, and operational responsibilities. <br /> $ 6,000 <br />9 Regulatory Compliance Framework: Document applicable State Water Resources Control Board / <br />Division of Drinking Water regulatory requirements, operator certification requirements, and reporting <br />expectations. <br /> $ 6,000 <br />10 Standard Operating Procedures – Core Operations: Develop procedures addressing routine operational <br />activities such as well operations, valve operations, hydrant operations, system flushing, and storage <br />tank operations. <br /> $ 60,000 •The final scope of procedures will be confirmed duringPhase I <br />scoping . <br />•The number of SOPs required may affect the final project cost. <br />11 Water Quality Monitoring & Sampling Procedures: Develop procedures addressing sampling <br />responsibilities, sampling protocols, laboratory coordination, and response procedures for abnormal <br />results. <br /> $ 8,000 <br />12 Emergency & Abnormal Operations Procedures: Develop procedures addressing water outages, loss of <br />pressure events, contamination concerns, and emergency response coordination. <br /> $ 8,000 <br />13 Asset Management & Maintenance Practices: Document operational inspection practices, preventive <br />maintenance expectations, and documentation practices. <br /> $ 6,000 <br />14 Safety & Risk Control Integration: Integrate safety considerations relevant to water operations including <br />confined space considerations, lockout/tagout coordination, chemical handling, and traffic control <br />practices. <br /> $ 6,000 <br />15 Documentation & Operational Records Guidance: Develop guidance regarding operational and <br />discharge logs, incident documentation, reporting protocols, and record retention expectations. <br /> $ 10,000 <br />16 Draft Manual Preparation: Compile manual sections into a formatted draft document and prepare for <br />City review. <br /> $ 5,000 <br />17 City Review Meetings & Revisions: Conduct review meetings with City staff and incorporate comments <br />into the final document. <br /> $ 6,000 <br />18 Final Manual Production: Prepare final manual and deliver electronic version suitable for future updates. $ 4,000 <br /> $ 131,000 The Phase II fee is an estimate based on the anticipated scope of work <br />described above. The final Phase II scope and cost will be confirmed <br />following completion of Phase I and will reflect the procedures, level of <br />detail, and documentation requirements identified during the Phase I <br />scoping process. <br /> $ 142,700.00 ESTIMATED PROJECT TOTAL PHASE I + PHASE II: <br />PHASE I TOTAL <br />Attachment 1.0: Proposal #26011897-1-1 <br />PHASE I <br />PHASE II <br />PHASE II ESTIMATED TOTAL <br />EXHIBIT A <br />Docusign Envelope ID: 0EBC15AD-FBDC-848B-836B-45B7F5070D43