Laserfiche WebLink
Volume Narrative page number <br />(OPTIONAL) <br />Landscape irrigation (exc golf <br />courses)Non-Potable 1072 1241 1272 1304 1339 <br />Other (Description Required)Non-Potable Dual Plumbing 1 1 1 1 1 <br />Other (Description Required)Non-Potable Construction uses 0 0 0 0 0 <br />0 0 0 0 0 0 <br />1,073 1,242 1,273 1,305 1,340 0 <br />1073 1242 ``1305 1340 0 <br />Check box if recycled water is not used and is not planned for use within the service area of the supplier. The supplier will only complete the column on "Potential <br />Recycled Water Use" and submit an accompanying narrative on the feasibility of that potential recycled water use. <br />Submittal Table 6-4 Retail: Recycled Water Direct Beneficial Uses Within Service Area <br />Water Code Section 10633 (c),(d),(e) <br />Potential Recycled Water Use <br />Name(s) of Facility/ies Producing (Treating) the Recycled Water (OPTIONAL) :DSRSD RWTF <br />Name of Supplier Operating the Recycled Water Distribution System (OPTIONAL) :City of Pleasanton <br />Volume of Supplemental Water Added in 2025 (OPTIONAL) : <br />Source of 2025 Supplemental Water (OPTIONAL) : <br />Subtotal Non-Potable <br />Total <br /> Use Type <br />Drop down list <br />Potable or Non-Potable <br />(after treatment if treated) <br />(OPTIONAL) <br />Drop down list <br />Additional Information <br />(as needed) <br />Add additional rows as needed <br />DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2- <br />3. <br />Additional Guidance: See Appendix M, Section M.21 for detailed guidance on this table. <br />Potential recycled water use: a description of the feasibility of these uses must be included in the narrative. <br />Multiple Producers: If you have multiple recycled water producers, submit a separate table for each. <br />NOTES: <br />(a) Pleasanton's dual plumbing connection is expected to continue to contribute approximately 1 AFY of demand <br />(b) Pleasanton's two construction connections are expected to continue to contribute less than 0.5 AFY of demand, which is rounded down to 0 AF . <br />2025 (AF)2030 (AF)2035 (AF)2040 (AF)2045 (AF) <br />Subtotal Potable