Laserfiche WebLink
2021 (AF)2022 (AF)2023 (AF)2024 (AF)2025 (AF) <br />0 0 0 0 0Total <br />NOTES: <br />Optional Table 6-8DS: Source Water Desalination by Urban Water Supplier <br />Check the box if the Supplier does not reduce salinity in either groundwater or surface water prior to distribution. <br />Volume of Water Desalinated <br />DWR NOTES: <br />Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the units of measure reported in Submittal Table 2-3. <br />Add additional rows as needed <br /> Desalination Facility <br />Drop Down list <br />Plant <br />Capacity <br />Intake Type <br />Drop down list <br />Source Water Type <br />Drop down list <br />Influent <br />TDS <br />Brine Discharge <br />Drop down list <br />Name(s) of Agencies <br />that Receive this Water