Laserfiche WebLink
Section 1 2025 Urban Water Management Plan <br />Plan Introduction City of Pleasanton <br /> Public Draft | May 2026 <br /> 1-4 EKI Environment & Water, Inc. <br />Expedite Permitting recommends that UWMPs clearly demonstrate the need for future or proposed ocean <br />desalination projects. <br />As discussed in Section 6.6, Pleasanton does not anticipate pursuing ocean desalination in the planning <br />horizon of this UWMP. <br />1.5 Plan Organization <br />This Plan is organized based on the sequence outlined in DWR’s 2025 UWMP Guidebook and includes the <br />following sections: <br />• Executive Summary – including a lay description of the UWMP and includes information related <br />to water service reliability and potential issues and strategies for managing reliability risks. <br />• Section 1 Plan Introduction <br />• Section 2 Plan Preparation <br />• Section 3 Service Area Description <br />• Section 4 Water Use Characterization <br />• Section 5 SB X7-7 Baseline, 2020 Target, and 2025 Reporting <br />• Section 6 Water Supply Characterization <br />• Section 7 Water Supply Reliability Assessment <br />• Section 8 Water Shortage Contingency Planning <br />• Section 9 Demand Management Measures <br />• Section 10 Plan Adoption, Submittal, and Implementation <br />• Appendices – including supporting documentation and supplemental information <br />UWMP Act excerpts are included in text boxes at the beginning of relevant sections. <br />Per CWC §10644(a)(2), this Plan incorporates DWR standardized 2025 UWMP tables for reporting water <br />use and supply information consistent with the UWMP Act. In addition, tables and figures beyond DWR’s <br />standard set are included as appropriate throughout to provide further context and connection to the <br />City’s related plans and efforts. To distinguish content related to DWR’s standardized tables, the <br />companion DWR table number is included in table titles throughout the Plan for accessible cross- <br />reference. <br />Consistent with DWR’s recommendation in the 2025 UWMP Guidebook, the City has included a complete <br />checklist of specific UWMP requirements and a copy of relevant standard reporting tables to assist DWR’s <br />review (Appendix A and Appendix B). <br />