My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton | Water Shortage Contingency Plan <br /> Public Draft | May 2026 <br /> 1 EKI Environment & Water, Inc. <br />INTRODUCTION <br />The City of Pleasanton (Pleasanton or City) has prepared this Water Shortage Contingency Plan (WSCP) in <br />conjunction with the 2025 Urban Water Management Plan (UWMP) per California Water Code (CWC) <br />Section (§) 10632. Water shortages occur whenever the available water supply cannot meet the normally <br />expected customer water use. Water shortages can be attributed to various causes, such as climate <br />change, drought, regulatory action, emergency, and/or catastrophic events. Shortage conditions could <br />occur at any time and may, or may not, be foreseen. The City intends for this WSCP to be dynamic such <br />that it may assess response action effectiveness and adapt to emergencies and catastrophic events. <br />This WSCP describes Pleasanton’s strategic plan to prepare for and respond to water shortage conditions <br />and to guide the City in preventing water service disruptions. Further, the WSCP aims to ensure adequate <br />supplies of water are available to meet the needs of the public and to further protect public health, safety, <br />and welfare, consistent with Chapter 9.30 of the Pleasanton Municipal Code (PMC). The WSCP is also <br />meant to prevent waste of water, unreasonable use of water, and unreasonable methods of water use. <br />Engrained in this plan is the City’s acknowledgement of water as a scarce natural resource that requires <br />careful management, not only in times of drought but at all times. <br />This WSCP provides the following prescriptive elements: <br />• Water Supply Reliability Analysis (Section 1): Summarizes the City’s water supply analysis and <br />reliability and identifies the key issues that may trigger a shortage condition. <br />• Annual Water Supply and Demand Assessment (AWSDA) Procedures (Section 2): Describes the <br />key data inputs, evaluation criteria, and methodology for assessing the system’s reliability for the <br />coming year and the steps to formally declare any water shortage levels and response actions. <br />• Six Standard Shortage Levels (Section 3): Establishes water shortage levels to clearly identify and <br />prepare for shortages. <br />• Shortage Response Actions (Section 4): Describes the response actions that may be implemented <br />or considered for each level to reduce gaps between supply and demand as well as minimize social <br />and economic impacts on the community. <br />• Communication Protocols (Section 5): Describes communication protocols under each level to <br />ensure customers, the public, and local government agencies are informed of shortage conditions <br />and requirements. <br />• Compliance and Enforcement (Section 6): Defines compliance and enforcement actions available <br />to administer demand reductions. <br />• Legal Authorities (Section 7): Lists the legal documents that grant the City the authority to declare <br />a water shortage and implement and enforce response actions. <br />• Financial Consequences of a WSCP (Section 8): Describes the anticipated financial impact of <br />implementing water shortage levels and identifies mitigation strategies to offset financial <br />burdens. <br />• Monitoring and Reporting (Section 9): Summarizes the monitoring and reporting techniques to <br />evaluate the effectiveness of shortage response actions and overall WSCP implementation. <br />Results are used to determine if shortage response actions should be adjusted. <br />• WSCP Refinement Procedures (Section 10): Describes the factors that may trigger updates to the <br />WSCP and outlines how to complete an update.
The URL can be used to link to this page
Your browser does not support the video tag.