Laserfiche WebLink
City of Pleasanton | Water Shortage Contingency Plan <br /> Public Draft | May 2026 <br /> 17 EKI Environment & Water, Inc. <br />without depleting the water supply of the distributor to the extent that there would be insufficient <br />water for human consumption, sanitation, and fire protection. <br />8 FINANCIAL CONSEQUENCES OF WSCP <br />This section describes the financial impacts of implementing the WSCP and mitigation actions needed to <br />address these impacts. <br />8.1 Financial Impacts and Mitigation Action <br />During periods of water shortage and reduced customer consumption, the City anticipates its revenue will <br />decrease due to reduced water demand. Meanwhile, the City anticipates its expenditures will increase <br />due to implementing water conservation measures to cover costs associated with increased customer <br />communication, expanded public outreach campaigns, enforcement staffing, operational adjustments, <br />and program administration. To compensate for lost revenue and increased expenditures, the City may <br />implement drought rates and pass through applicable wholesale shortage surcharges in accordance with <br />adopted fee schedules. <br />8.2 Reporting Cost of Compliance with Excessive Water Use Prohibition during Drought <br />Emergency <br />The City complies with CWC §10632 by implementing measures to prohibit excessive water use from <br />customers. The City achieves compliance through implementation of its WSCP, PMC Chapter 9.30, and <br />PMC §14.04.060. Costs are primarily related to added administrative tasks and enforcement, which <br />include increased labor and contractor assistance. The total cost of compliance depends on the water <br />shortage level and duration. <br />9 MONITORING AND REPORTING <br />From water supply sources to individual customer connections, the City’s water system is fully metered. <br />City staff can use data from meters to monitor for compliance and report progress. The City’s meters at <br />its water sources (i.e., turnouts from Zone 7 and groundwater production wells) provide a systemwide <br />overview of water supply and demands. Further, most of the City’s customer accounts are connected to <br />the Advanced Metering Infrastructure (AMI) system that allows for real-time monitoring. Approximately <br />300 of the City’s customer meters are not connected to AMI due to terrain challenges with connectivity. <br />The City may use metering information to assess progress in meeting its water shortage response <br />objectives, as part of its meter management program. <br />During drought, Pleasanton staff compare expected/requested water use reductions to observed savings, <br />track response action implementation, and report results through required monthly and annual reporting <br />processes. City staff use monitoring results to inform recommendations for maintaining, escalating, or de- <br />escalating shortage stages and to refine implementation assumptions for future assessments. <br />10 WSCP REFINEMENT PROCEDURES <br />This WSCP is an adaptive plan that is subject to refinements as needed to ensure that the City’s shortage <br />response actions and mitigation strategies are effective and produce the desired results. Based on <br />monitoring described in Section 9 and the need for compliance and enforcement actions described in <br />Section 6, the City may adjust its response actions and modify its WSCP. The City may also seek input from <br />staff and the public regarding the effectiveness of its WSCP and ideas for improvements.