My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2 2025 Urban Water Management Plan <br />Plan Preparation City of Pleasanton <br /> Public Draft | May 2026 <br /> 2-4 EKI Environment & Water, Inc. <br />2.3.2 Coordination with Other Agencies and the Community <br /> <br />In addition to coordinating the preparation of this 2025 UWMP and WSCP with Zone 7, Pleasanton also <br />coordinated with DSRSD, Livermore, Cal Water, and DSRSD-East Bay Municipal Utility District (EBMUD) <br />Recycled Water Authority (DERWA). <br />Pleasanton actively encourages community participation in water management activities and specific <br />water-related projects. Pleasanton’s public participation program includes both active and passive <br />approaches for obtaining input from the community, such as mailings, public meetings, and web-based <br />communication. Pleasanton’s website describes on-going projects and posts announcements of planned <br />rate increases to fund these water projects (www.cityofpleasantonca.gov). <br />As part of the 2025 UWMP and WSCP update, Pleasanton facilitated a public review period. Per Section <br />6066 of the California Government Code (CGC), the City provided public notification to commence a public <br />comment period and to announce the date and location of the public hearing (Appendix F). During the <br />public comment period, the Draft 2025 UWMP, including the updated WSCP, was made available at the <br />Pleasanton Public Library and was posted on the City’s website (www.PleasantonWaterConservation.com). <br />The City held a duly noticed public hearing on June 2, 2026. The public hearing provided an opportunity <br />for ratepayers and the public to become familiar with the UWMP and ask questions about the City’s water <br />supply and plans for continuing to provide a reliable, safe, high-quality- water supply. <br />2.3.3 Notice to Cities and Counties <br /> <br />In December 2025, a notice of preparation was sent to the cities and counties and other stakeholders to <br />inform them of the UWMP and WSCP update process and schedule, and to solicit input for the 2025 <br />UWMP and updated WSCP. In addition to the agencies listed in Section 2.3.2, these include: <br />• San Francisco Public Utilities Commission <br />• Pleasanton Unified School District <br />• Pleasanton Chamber of Commerce <br />• Pleasanton Downtown Association <br />• Hacienda Business Park Owners Association <br /> CWC §10620 <br />(d)(3) Each urban water supplier shall coordinate the preparation of its plan with other appropriate agencies in <br />the area, including other water suppliers that share a common source, water management agencies, and relevant <br />public agencies, to the extent practicable. <br /> CWC §10642 <br />Each urban water supplier shall encourage the active involvement of diverse social, cultural, and economic <br />elements of the population within the service area prior to and during the preparation of both the plan and the <br />water shortage contingency plan… <br /> CWC §10621 <br />(b) Every urban water supplier required to prepare a plan pursuant to this part shall, at least 60 days before the <br />public hearing on the plan required by Section 10642, notify any city or county within which the supplier provides <br />water supplies that the urban water supplier will be reviewing the plan and considering amendments or changes <br />to the plan.
The URL can be used to link to this page
Your browser does not support the video tag.