My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 2025 Urban Water Management Plan <br />Service Area Description City of Pleasanton <br /> Public Draft | May 2026 <br /> 3-10 EKI Environment & Water, Inc. <br />3.5 Water Distribution System <br />Pleasanton operates separate potable and non-potable water distribution systems. Sections 3.5.1 and <br />3.5.2 describe the facilities and components of the two separate systems. <br />The non-potable system supplies recycled water treated at DSRSD’s Regional Wastewater Treatment <br />Facility (RWTF). Pleasanton’s supply portfolio also includes recycled water, which the City receives from <br />Livermore and through the San Ramon Valley Recycled Water Program (SRVRWP), which is operated by <br />DERWA. <br />3.5.1 Potable Water Distribution System <br />Until 2023, Pleasanton purchased about 75% of its potable supply from Zone 7 in the form of treated <br />water. The remainder was met through groundwater pumped from local wells owned and operated by <br />the City. Water from the City’s wells was treated with chlorine, ammonia, and fluoride prior to entering <br />the water distribution system. However, due to contamination risk from per- and polyfluoroalkyl <br />substances (PFAS), the City chose to stop operating its groundwater wells in 2023. Pleasanton plans to <br />reintroduce groundwater as a source for its system; more detail on groundwater supply is provided in <br />Section 6.2. <br />Since 2023, Zone 7 has supplied all of the City’s potable water. Supply from Zone 7 enters Pleasanton’s <br />water system at seven different turnout locations, as follows: <br />• Turnout 1 is located on Santa Rita Road near Stoneridge Drive <br />• Turnout 2 is located on Hopyard Road near Valley Trails Drive <br />• Turnout 3 is located at the east end of West Las Positas Boulevard near Gulfstream Street <br />• Turnout 4 is located on Hopyard Road at Stoneridge Drive <br />• Turnout 5 is located on Bernal Avenue at Nevada Street <br />• Turnout 6 is located on Machado Drive at Vineyard Avenue <br />• Turnout 7 is located on Vineyard Avenue at Ruby Hills Boulevard <br />All turnouts are equipped with facilities to fluoridate supply prior to introducing it into Pleasanton’s <br />potable water system. Turnouts 1, 2, 3, 4, and 5 directly supply the system, with Turnouts 3-5 serving the <br />majority, and turnouts 6 and 7 connect to the Vineyard and Ruby Hills water pump stations, which <br />pressurize the system. <br />Pleasanton’s potable system currently consists of approximately 340 miles of pipelines and 22,370 water <br />service connections. The system has 12 pump stations, 20 water storage reservoirs, and one <br />hydropneumatic tank. The service area has 16 different pressure zones. Pressuring reducing valves and <br />pump stations help to maintain appropriate pressures within each zone. <br />Pleasanton has emergency interties to connect the potable system with those of neighboring water <br />suppliers, including two interties with DSRSD and one with Livermore. These interties are strictly for <br />emergency conditions, such as a major pipeline break, supply contamination, or water service interruption <br />that may be caused by earthquakes, floods, or other disasters. <br />In preparing the 2024 WDSCMP, the City recently evaluated the potable distribution system’s current <br />condition and its capacity to meet future water demands. While the evaluation concluded that capacity <br />in much of the system is adequate to meet anticipated future demands, several improvements were <br />recommended, including: increasing local storage, updating and upsizing aging water mains, and <br />increasing looped connectivity within the system to enhance pressure distribution (Pleasanton, 2024). <br />Figure 3-6 identifies key aspects of the City’s potable distribution system and its 16 pressure zones, as <br />identified in the 2024 WDSCMP.
The URL can be used to link to this page
Your browser does not support the video tag.