My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 2025 Urban Water Management Plan <br />Service Area Description City of Pleasanton <br /> Public Draft | May 2026 <br /> 3-12 EKI Environment & Water, Inc. <br />3.5.2 Non-Potable Water Distribution System <br />Over a decade ago, Pleasanton established its recycled water program with a goal of using recycled water <br />in place of potable supply to meet irrigation demands along the alignment of its non-potable distribution <br />system. The City purchases recycled water from DERWA and Livermore. <br />In June 2015, construction began on Pleasanton’s Recycled Water Project (RW Project) with funding <br />supported through a Clean Water State Revolving Fund Program loan and Proposition 1 Program Grant <br />Agreement with the SWRCB. The City substantially completed construction of the RW Project by <br />September 2016. The construction involved installing approximately 51,500 linear feet (LF) (or 9.8 miles) <br />of new recycled water pipeline, ranging in diameter from 6 to 20 inches, and repurposing approximately <br />22,400 LF (4.2 miles) of existing potable pipeline for recycled water distribution. <br />The recycled water pipelines connect to DSRSD’s RWTF and the City’s existing 8 million gallon (MG) <br />recycled water reservoir (Tassajara Reservoir), which was converted from a potable water storage facility <br />in 2017. In 2019, the City also added a new recycled water pump station at the Ken Mercer Sports Park. <br />Livermore supplies recycled water to the northeast portion of Pleasanton. The City constructed that <br />portion of the recycled water system concurrently with new development projects and initially began <br />serving recycled water in 2013-2014 under Livermore’s recycled water permit coverage, until Pleasanton <br />obtained authorization under its own permit coverage in July 2015. <br />Currently, the City has 98 permitted sites with 150 metered connections (out of 161 targeted <br />connections). <br />
The URL can be used to link to this page
Your browser does not support the video tag.