Laserfiche WebLink
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-1 EKI Environment & Water, Inc. <br />6 WATER SUPPLY CHARACTERIZATION <br /> <br />This section describes Pleasanton’s existing and projected water supply portfolio under normal water year <br />conditions. The availability of the City’s water supplies under a single dry year and a drought lasting five <br />years, as well as more frequent and severe periods of drought, are detailed in Section 7 of this UWMP. <br />The City’s water supply portfolio consists of: <br />• Zone 7 purchases – Pleasanton’s primary water source is treated potable supply purchased from <br />Zone 7. As such, Zone 7’s water supplies, storage operations, and future supply projects are <br />discussed. <br />• Groundwater – Pleasanton typically supplements its Zone 7 purchases with groundwater <br />pumped from City-owned wells in the Livermore Valley Groundwater Basin (Basin). The City’s <br />groundwater supply is limited by its groundwater pumping quota (GPQ), managed by Zone 7 as <br />the local groundwater basin manager. <br />• Recycled water – The City augments its potable water supply with recycled water produced by <br />DSRSD and Livermore. <br />This section also addresses the energy intensity used to operate the City’s water distribution systems and <br />wastewater collection system. <br />6.1 Purchased Water <br /> <br />6.1.1 Water Supply Purchases from Zone 7 <br />Zone 7 is the Pleasanton’s sole wholesale supplier for potable water. Under the existing agreement with <br />Zone 7, the City is limited in developing other potable water supply sources. The treated water delivered <br />by Zone 7 complies with the Requirements for Drinking Water of the California Department of Health <br />Services and the U.S. Environmental Protection Agency (EPA), or their successor regulatory agencies. <br />6.1.2 Zone 7 Water Supply Sources <br />This section details Zone 7’s water sources and supply management. Zone 7’s water supply has two major <br />components: <br /> CWC §10631(b) A plan shall be adopted in accordance with this chapter that shall do all of the following: <br />Identify and quantify, to the extent practicable, the existing and planned sources of water available to the supplier <br />over the same five-year increments described in subdivision (a). <br /> CWC §10631(h) A plan shall be adopted in accordance with this chapter and shall do all of the following: <br />An urban water supplier that relies upon a wholesale agency for a source of water shall provide the wholesale <br />agency with water use projections from that agency for that source of water in five-year increments to 20 years <br />or as far as data is available. The wholesale agency shall provide information to the urban water supplier for <br />inclusion in the urban water supplier’s plan that identifies and quantifies, to the extent practicable, the existing <br />and planned sources of water as required by subdivision (b), available from the wholesale agency to the urban <br />water supplier over the same five-year increments, and during various water-year types in accordance with <br />subdivision (f). An urban water supplier may rely upon water supply information provided by the wholesale <br />agency in fulfilling the plan informational requirements of subdivisions (b) and (f).