My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-3 EKI Environment & Water, Inc. <br />6.1.2.1.2 Table A Allocation <br />Each SWC’s individual contract sets a maximum annual SWP supply limit, specified in Article 6(c) and <br />Table A of the contract. This supply limit is commonly referred to as “Table A.” Following the initial <br />agreement in 1961, DWR amended Zone 7’s contract over the years and increased its Table A amount to <br />46,000 AFY in 1997. Since then, Zone 7’s Table A amount has increased to 80,619 AFY through a series of <br />five permanent transfers from other SWCs, including: <br />• In December 1999, Zone 7 secured Table A SWP allocations from Lost Hills Water District of <br />15,000 AFY and Berrenda Mesa Water District of 7,000 AFY. <br />• In December 2000, Zone 7 acquired 10,000 AFY of SWP allocation from Belridge Water Storage <br />District. <br />• In October 2003, Zone 7 obtained an additional 2,219 AFY was obtained from Belridge Water <br />Storage District. <br />• Finally, in 2003, Zone 7 acquired 400 AFY from the Tulare Lake Basin Water Storage District. <br />In practice, the SWP water available to Zone 7 under the Table A allocation process (presented as % of the <br />Table A allocation) varies from year to year due to hydrologic conditions, water demands of other SWCs, <br />existing SWP stored water, SWP facility capacity, and environmental/regulatory requirements. The Table <br />A allocation is typically less than 100% of the Table A amount. SWP reliability is defined based on the long- <br />term average Table A allocation. <br />DWR prepares a biennial SWP Delivery Capability Report (DCR) to assist SWCs and local planners in <br />assessing the availability of supplies from the SWP. DWR issued its most recent update, the Draft 2025 <br />DCR, in December 2025. In this update, DWR provided SWP supply estimates for SWCs to use in their <br />planning efforts, including for use in their 2025 UWMPs. The Draft 2025 DCR includes DWR’s estimates of <br />SWP water supply availability under both existing (2025) and future (2043) conditions. <br />DWR’s estimates of SWP deliveries are based on the CalSim 3 computer model that simulates monthly <br />operations of the SWP and Central Valley Project (CVP) systems. Key inputs to the model include the <br />relevant facilities included, hydrologic inflows, regulatory and operational constraints, and contractor <br />demands for both CVP and SWP water. In conducting its model studies, DWR develops assumptions <br />and/or scenarios for these key inputs. <br />In the Draft 2025 DCR, for existing conditions, DWR assumes: existing facilities, hydrologic inflows based <br />on 100 years of historical data (1921 through 2021) adjusted to incorporate recent changes to climate; <br />current regulatory and operational constraints including 2018 Coordinated Operation Agreement (COA) <br />Amendment, 2024 Biological Opinions, and 2024 SWP Incidental Take Permit; and SWC demands at <br />maximum Table A amounts. The long-term average allocation reported in the Draft 2025 DCR for the <br />existing conditions provides an appropriate estimate for current SWP water supply availability. <br />To evaluate SWP supply availability under future conditions, the Draft 2025 DCR includes three scenarios <br />for climate change conditions in 2043 that represent different risk-informed levels of concern surrounding <br />how climate change uncertainty will impact rising temperatures, shifting precipitation patterns, reduced <br />snowpack, sea level rise, and other factors impacting future SWP water availability. The three risk- <br />informed climate scenarios (50%, 75%, and 95% level of concern) are defined based on projected climate- <br />informed system performance levels of April-to-July unimpaired runoff (Eight River Index) in the Delta <br />watershed for 2028-2057. The 50% level of concern represents a middle-of-the-road or central tendency <br />future, while the 75% level of concern scenario represents a worse than average future, and the 95% level <br />of concern represents much worse. A 95% level of concern scenario depicts a future condition with lower <br />SWP reliability than what results from 95% of model-informed climate outcomes.
The URL can be used to link to this page
Your browser does not support the video tag.