My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-2 EKI Environment & Water, Inc. <br />UWMP, the results are presented in DWR’s required tables, listing the supply availability and potential <br />shortages under normal, single dry, and multi dry year periods from 2025 to 2050. <br />7.1 Constraints on Water Sources <br />This section discusses the constraints on Pleasanton's potable water supply from Zone 7 and the recycled <br />water supply that it produces. Strategies for managing the risks associated with each supply are also <br />discussed. <br />7.1.1 Purchased Water Supply from Zone 7 <br />One of the main limitations of Zone 7’s water system is the lack of interties. All of Zone 7’s imported water <br />supplies are conveyed through the Delta and the SBA; Arroyo Valle water is also conveyed through the <br />SBA. Zone 7 has been working closely with DWR, VW, and ACWD to improve the reliability of the SBA. <br />Between 2003 and 2012, DWR made improvements to the SBA within Zone 7’s service area to increase <br />capacity and improve reliability. The work included a new pump station (180 cubic feet per second (cfs)), <br />inline reservoir (500 AF) and increased the canal carrying capacity to 380 cfs. As part of this project, Zone <br />7 had an emergency slide gate installed to maintain service in the event of a pipeline rupture downstream. <br />Zone 7 will continue coordinating with DWR and South Bay Contractors to improve the reliability of the <br />entire SBA system <br />In addition, Zone 7 is pursuing the following projects to diversify its conveyance options: <br />• Reliability Intertie – Zone 7 is also planning for the construction of a reliability intertie with <br />another major water agency that would provide an alternative means of conveying water to <br />Zone 7’s service area when the Delta and/or the SBA undergo an outage. For example, an <br />intertie with EBMUD could convey treated water supply to the western portion of Zone 7’s <br />service area. <br />• Chain of Lakes Conveyance System – This project would allow for access to water stored in <br />the COLs as an alternative local water supply; water would be accessible to the Del Valle <br />Water Treatment Plant (WTP) via one of the SBA turnouts. <br />7.1.1.1 SWP Supplies <br />Constraints on the SWP water supplies, including Delta conveyance, water quality, and SBA conveyance <br />are discussed below. <br />7.1.1.1.1 Delta Conveyance <br />Zone 7’s long-term contract with DWR for SWP supply provides Zone 7 access to Table A water, Article <br />56c carryover water, and Article 21 water. As a SWC, Zone 7 can use SWP facilities to convey water <br />transfers or exchanges of SWP water (from another contractor) or from another water agency outside of <br />the SWP system. SWP water moves through the Delta before it is conveyed by the California Aqueduct <br />and the SBA to Zone 7's water facilities. <br />The instability of the aging levees in the Delta (including their vulnerability to seismic events and climate <br />change, further discussed in Section 7.1.5), regulatory uncertainty, water quality issues such as saltwater <br />intrusion, and the impacts of climate change on water supply (such as reduced snowpack, altered runoff <br />timing, and increased drought frequency), along with the declining health of the Delta ecosystem, all <br />challenge the long-term reliability of the SWP and, more generally, the Delta’s water conveyance <br />capability. These issues directly challenge the Tri-Valley’s long-term water supply reliability since a <br />majority of Zone 7’s water supply is and will continue to be tied to the Delta and SWP system. Zone 7’s <br />2025 UWMP discusses additional current and future constraints on Delta conveyance, including
The URL can be used to link to this page
Your browser does not support the video tag.