My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-4 EKI Environment & Water, Inc. <br />the Delta may be restricted, reducing the amount of water supply available during certain <br />times of the year. Salinity intrusion can be a problem during dry years, when there is <br />insufficient freshwater to repel salinity. Sea level rise due to climate change is also expected <br />to increase salinity in the Delta. Finally, levee breaks due to earthquakes and other factors <br />would result in significant saltwater intrusion from the Bay as water floods affected islands <br />that are below sea level in the Delta. <br />• Algal blooms: In addition to T&O and the threat of algal toxins, algal blooms can significantly <br />degrade filter performance through clogging. Filter clogging reduces plant production <br />capacities and could require supplemental groundwater use. <br />As noted above, Zone 7 has state-of-the-art ozonation facilities at the DVWTP and PPWTP. Ozonation <br />improves treatment of T&O, TOC/DOC, turbidity, and algal blooms and significantly increases the surface <br />water system’s reliability. <br />In 2008, the SBA contractors (Valley Water, ACWD, and Zone 7) developed the SBA Watershed Protection <br />Program to protect water quality once the water from the Delta reaches the SBA. The primary objectives <br />of the SBA Watershed Protection Program include developing a Watershed Management Program for the <br />SBA system, including Lake Del Valle and Bethany Reservoir, and protecting local drinking water and water <br />resources from identified contaminant sources (e.g., septic tanks) for urban, agricultural, recreational, and <br />environmental uses. <br />Additional information on Water Quality Control Plan for the San Francisco Bay/Sacramento-San Joaquin <br />Delta Estuary (Bay-Delta Plan) is included in the Zone 7 2025 UWMP. <br />7.1.1.1.3 SBA Conveyance <br />A limitation of Zone 7’s water supply system is its dependence on the SBA. All of Zone 7’s imported water <br />supplies are conveyed through the Delta and the SBA; Arroyo Valle water is also conveyed through the <br />SBA. Zone 7 has continuously worked with DWR, Valley Water, and ACWD to improve the reliability of the <br />SBA. Between 2003 and 2012, DWR made improvements to the SBA within Zone 7’s service area to <br />increase capacity and improve reliability. The work included building a new pump station (180 cfs) and <br />Dyer reservoir (500 AF) and increasing the canal carrying capacity to 350 cfs. As part of this project, DWR <br />installed an emergency slide gate to maintain service to Zone 7 in the event of a pipeline rupture <br />downstream. Zone 7 will continue coordinating with DWR and the other SBA contractors to improve <br />reliability of the entire SBA system. <br />A recent possible threat to Zone 7’s primary water supply emerged in 2024 when DWR discovered Golden <br />Mussels in the Delta. Since then, these organisms have proliferated throughout the SWP system as far <br />away as southern California. This species, which is more resilient than the previously discovered Zebra <br />Mussel, has the potential to clog water systems by settling and growing in pipes, valves, pumps, gates, <br />canals or any other surface suitable for settling. Individual specimens have been found in the SBA, but <br />colonies have not yet been confirmed. DWR, in collaboration with DFW, is developing a Golden Mussel <br />management plan including chemical injection, UV radiation and physical removal at critical facilities. <br />Experts have stated that it is unlikely that this invasive species can be fully eradicated, but measures can <br />be taken to minimize their impact. Zone 7 is carefully monitoring the situation and is taking precautions <br />to avoid disruption to its water supply. Zone 7 is also obtaining guidance from DFW on developing a <br />Golden Mussel control plan. <br />In addition, Zone 7 is pursuing the COLCS project to reduce its reliance on the SBA. This project would <br />allow for access to water stored in the COLs as an alternative local water supply and storage source; water <br />would be pumped to DVWTP for use.
The URL can be used to link to this page
Your browser does not support the video tag.