My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-6 EKI Environment & Water, Inc. <br />Zone 7 will continue to coordinate closely with DWR, other SWCs, Semitropic, and Cawelo to ensure the <br />future reliability of the banked water supplies. Zone 7 will also continue to pursue new non-local <br />groundwater banking opportunities. <br />Additionally, some of Semitropic’s wells are contaminated with arsenic and trichloropropane. This is <br />currently being managed through treatment before the affected groundwater is pumped into the <br />California Aqueduct. The DWR Facilitation Group established arsenic criteria for this “pump-in” to mitigate <br />any impacts to the downstream SWCs. Semitropic and the banking partners have developed a <br />coordination process for discussing arsenic treatment. While the presence of arsenic in the Semitropic <br />groundwater bank may increase the cost of this water storage option, it is not likely to affect overall <br />reliability levels. <br />7.1.1.6 Water Exchanges and Transfers <br />Transfer water can be used to supplement Zone 7’s existing water supplies. Advantages of water transfers <br />include: 1) they can be pursued as needed in any given year and 2) they do not require new infrastructure. <br />Annual water transfers are subject to water market conditions. Generally, water transfers are less <br />expensive in wet years when extra water is available and more expensive in dry years when extra water <br />is scarce. One strategy Zone 7 could utilize is purchasing more water during wet years at a lower cost to <br />store for later use in dry years. Zone 7 continues to pursue and evaluate water transfer opportunities in <br />the Bay Area and statewide. <br />7.1.2 Groundwater <br />Section 6.2 details the issues affecting Zone 7’s use of the Main Basin, specifically water quality management <br />and prevention of overdraft. <br />Zone 7 is actively implementing its SNMP. Basin salt levels are being addressed primarily through <br />groundwater pumping and demineralization using the MGDP in the Mocho Wellfield. Simultaneously, the <br />Basin is being recharged with water containing low salt concentrations. The facility allows for the export <br />of concentrated minerals or salts from the Main Basin while improving the water quality of treated water. <br />The MGDP is expected to be offline from 2026 to 2028 while a new PFAS treatment facility is constructed <br />at the Mocho Wellfield. Zone 7 will continue its Basin management under the SNMP while the facility is <br />down. <br />PFAS have been detected above the EPA’s proposed MCLs and the Response and Notification Levels <br />established by DDW in several of Zone 7’s wellfields. Zone 7 is managing PFAS under its PFAS management <br />strategy by monitoring contaminant levels, blending and treating groundwater, and diversifying <br />groundwater resources. Zone 7 is planning a dedicated Mocho PFAS Treatment Plant at the existing <br />Mocho Well 3 facility. This facility, which will be Zone 7’s third PFAS treatment project following the <br />Stoneridge and COLs PFAS plants, will use ion exchange technology to remove PFAS from Mocho Wellfield <br />groundwater and restore production reliability. Planning, environmental review, and funding efforts are <br />underway, with design anticipated in 2026 and construction expected to follow. Zone 7 continues to meet <br />water quality standards and is currently meeting the PFAS MCLs ahead of the EPA’s deadline. <br />While Zone 7 has several groundwater wells with naturally occurring hexavalent chromium (Cr(VI)) <br />concentrations, the levels have been below the current MCL, 50 micrograms per liter (μg/L) MCL. On <br />October 1, 2024, the SWRCB reduced the Cr(VI) MCL to 10 μg/L, effective October 1, 2026. Zone 7 has <br />detected Cr(VI) at levels near the upcoming 10 μg/L MCL at several wells and continues to monitor <br />groundwater for Cr(VI) and research treatment options if necessary for elevated concentrations. Zone 7 <br />is currently delivering treated groundwater with Cr(VI) concentrations below the upcoming 10 μg/L MCL.
The URL can be used to link to this page
Your browser does not support the video tag.