Laserfiche WebLink
<br />conduct its operations to cause the least possible obstruction and inconvenience to public traffic. To the <br />greatest extent possible, all traffic shall be permitted to pass through the work area. For work requiring <br />traffic control, the Contractor must submit a traffic control plan to the City of Pleasanton Public Works <br />Department for approval 72 hours prior to the scheduled work. <br /> <br />Work involving single-lane closures on major arterials, including Foothill Road, Hopyard Road, Santa <br />Rita Road, Bernal Avenue, Sunol Boulevard, First Street, Stanley Boulevard, Vineyard Avenue, <br />Stoneridge Drive, Stoneridge Mall Road, Hacienda Drive, Valley Avenue, and Owens Drive, will be <br />restricted to 9:30 am to 3:00 pm. Pedestrian and driveway access must be maintained at all times. <br /> <br /> <br />VEHICLE/UNIFORMS/EQUIPMENT <br />All Vehicles utilized by the contractor shall have wording which clearly identifies the contractor/company. <br /> <br />All employees on site are to wear clothing which clearly identifies the contractor/company. <br /> <br />Transportation of equipment on public streets shall comply with California State Vehicle Code with <br />Department of Transportation, and under the guidance of California Environmental Protection Agency <br />Department of Toxic Substances Control (DTSC). <br /> <br /> <br />SAFETY TRAINING/PROCEDURES <br />Before commencing any work under this Agreement, the Contractor shall submit a comprehensive, <br />written Safety Training and Procedures Program for review and acceptance by the City of Pleasanton. <br />The program shall demonstrate full compliance with all applicable federal, state, and local safety <br />regulations, including but not limited to the California Occupational Safety and Health Act (Cal/OSHA), <br />Title 8 of the California Code of Regulations, and applicable Federal OSHA standards. <br /> <br />At a minimum, the Contractor’s safety program shall address training, policies, and procedures <br />applicable to the scope of work identified in this RFB, including but not limited to fire alarm inspection, <br />testing, maintenance, repair, system installation, and interaction with building systems within occupied <br />City facilities. <br />Required Safety Program Elements <br />The Contractor’s safety program shall include, but not be limited to, the following components: <br />1. General Safety Compliance <br />• A written Injury and Illness Prevention Program (IIPP) compliant with Cal/OSHA requirements <br />• Employee safety orientation and job-specific training documentation <br />• Hazard identification, mitigation, and reporting procedures <br />• Emergency response and incident reporting protocols <br /> <br />2. Hazardous Materials and Chemical Safety <br />• A Hazard Communication Program, including employee training on Safety Data Sheets <br />(SDS/MSDS) <br />• Proper handling, storage, and disposal of batteries, electronic components, and other hazardous <br />materials <br />Docusign Envelope ID: 3B72E0E1-49B0-81A0-82B4-6F3690F68EF8