Laserfiche WebLink
Page 26 <br /> The City of Pleasanton owns, maintains, rehabilitates, and replaces the curb and gutter <br /> along the border of the Assessment District. This infrastructure serves to support and <br /> contain the Improvements and manage irrigation flow. The contribution from the City <br /> toward the maintenance, rehabilitation, and replacement of curb and gutter is <br /> conservatively estimated at 10%. In other words,if the Assessment District were required <br /> to construct and maintain the local curb and gutter,the budget would increase by at least <br /> 10%. <br /> The City of Pleasanton owns and maintains a storm drainage system along the border of <br /> the Assessment District.This system serves to prevent flooding and manage urban runoff <br /> from the Improvements. The contribution from the City toward the maintenance, <br /> rehabilitation, and replacement of the local storm drainage system is conservatively <br /> estimated at 10%. <br /> The City of Pleasanton owns and maintains local public streets throughout the <br /> Assessment District. These streets provide access to the Improvements for their <br /> enjoyment and efficient maintenance. The contribution from the City toward the <br /> maintenance, rehabilitation, and replacement of local public streets is conservatively <br /> estimated at 10%. <br /> The value of the initial Improvements constructed by the Developer can be quantified and <br /> monetized as an annuity to be amortized.Since the initial Improvements were performed <br /> and paid for by non-assessment funds, this annuity is conservatively estimated to <br /> contribute 20%toward the general benefit requirement. <br /> In addition to the infrastructure contributions described above, the City of Pleasanton <br /> provides ongoing staff support for the administration of the Assessment District that is <br /> not reimbursed through the assessment and is not included in the percentage estimates <br /> above. The City's Landscape Architect dedicates time throughout the year to the <br /> preparation of bid documents, contractor selection and monitoring, property owner <br /> inquiries,site inspections, coordination with other City departments,and general district <br /> administration. The City administration fee collected through the assessment is $1,800 <br /> per year. The value of the City Landscape Architect's time dedicated to the Assessment <br /> District exceeds this amount, meaning the City absorbs the difference as a further in-kind <br /> contribution toward the general benefit requirement. This unreimbursed staff time <br /> represents an ongoing financial contribution by the City to the Assessment District that is <br /> separate from and in addition to the infrastructure contributions described above, and <br /> further demonstrates that the City's total contributions to the District more than satisfy <br /> the general benefit requirement. <br /> In total, the City of Pleasanton's in-kind contributions represent 50%of the total district <br /> cost,which more than satisfies the 24.51%general benefit requirement. <br /> City of Pleasanton <br /> Ponderosa-Del Prado Landscape Maintenance District 2026-1 SCIConsultingGroup <br /> Engineer's Report Public Finance Consulting Services <br />