My WebLink
|
Help
|
About
|
Sign Out
RES 2026028
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2026 4:00:13 PM
Creation date
5/18/2026 3:59:22 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/5/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES NO. 2026-028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 28 <br /> benefits of the improvement(e.g., general enhancement of the district's property <br /> values). <br /> The Engineer determined that, based on proximity to the Improvements and the nature <br /> of the benefits received,the Assessment District shall consist of five zones of benefit.The <br /> zones reflect material differences in the degree of trail access and soundwall landscaping <br /> adjacency received by different properties within the District. All zones receive the <br /> Creation of Lots benefit(5%weight)and the Views of Improved Landscaping benefit(60% <br /> weight) equally. The zones differ with respect to the Access to Centennial Trail benefit <br /> (30%weight)and the Security and Sound Reduction benefit(5%weight). <br /> Base Level <br /> Zone 1 is the Base Level, which includes the majority of residential parcels in the <br /> Assessment District.These parcels receive the full view and landscaping benefit from the <br /> maintained improvements along Paseo Santa Cruz and the Arroyo trail corridor, and the <br /> Creation of Lots benefit.Zone 1 parcels are at greater distance from the trail access points <br /> and are not adjacent to the soundwall landscaping along Interstate 680. They receive a <br /> trail access score of 70 out of 100, reflecting that while they are within the District and <br /> benefit from the maintained trail corridor, they do not have direct proximate access to <br /> trail entry points. They receive a security/sound reduction score of 0, as they are not <br /> adjacent to the soundwall landscaping. <br /> Central Wall <br /> Zone 2 is the Central Wall area which includes parcels located along the interior semi- <br /> circle adjacent to the soundwall with landscaping maintained along the sidewalk edges. <br /> In addition to the view, landscaping,and lot creation benefits received by all zones,these <br /> parcels receive a direct and tangible security and sound reduction benefit from the <br /> maintained landscaping. Central Wall parcels receive the same trail access score as Base <br /> Level (70 out of 100) and a security/sound reduction score of 80 out of 100, reflecting <br /> their proximity to and benefit from the maintained landscaping along the interior <br /> soundwall. <br /> Adjacent to Trail <br /> Zone 3 is called Adjacent to Trail and includes parcels that are directly adjacent to the <br /> Arroyo de la Laguna trail and the maintained landscaping along the soundwall along <br /> Interstate 680. These parcels receive both an enhanced landscaping benefit and a trail <br /> adjacency benefit. Adjacent to Trail parcels receive a trail access score of 70 out of 100 <br /> and a security/sound reduction score of 100 out of 100, reflecting their direct adjacency <br /> to the maintained landscaping(along the soundwall). <br /> City of Pleasanton <br /> Ponderosa-Del Prado Landscape Maintenance District 2026-1 SCIConsultingGroup <br /> Engineer's Report °,,n1 °r,su.ti^e <br />
The URL can be used to link to this page
Your browser does not support the video tag.