My WebLink
|
Help
|
About
|
Sign Out
RES 2026030
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2026 4:08:30 PM
Creation date
5/18/2026 4:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/5/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES NO. 2026-030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 27 <br /> In addition to the infrastructure contributions described above, the City of Pleasanton <br /> provides ongoing staff support for the administration of the Assessment District that is <br /> not reimbursed through the assessment and is not included in the percentage estimates <br /> above. The City's Landscape Architect dedicates time throughout the year to the <br /> preparation of bid documents, contractor selection and monitoring, property owner <br /> inquiries,site inspections, coordination with other City departments, and general district <br /> administration. The City administration fee collected through the assessment is $1,800 <br /> per year. The value of the City Landscape Architect's time dedicated to the Assessment <br /> District exceeds this amount, meaning the City absorbs the difference as a further in-kind <br /> contribution toward the general benefit requirement. This unreimbursed staff time <br /> represents an ongoing financial contribution by the City to the Assessment District that is <br /> separate from and in addition to the infrastructure contributions described above, and <br /> further demonstrates that the City's total contributions to the District more than satisfy <br /> the general benefit requirement. <br /> In total, the City of Pleasanton's in-kind contributions represent 50%of the total district <br /> cost,which more than satisfies the 36.94%general benefit requirement. <br /> Table 5—City In-Kind General Benefit Contributions <br /> City In-Kind Contribution Percentage <br /> Curb and gutter maintenance, rehabilitation, and replacement 10.0% <br /> Storm drainage system maintenance, rehabilitation, and 10 0% <br /> replacement <br /> Local public streets maintenance, rehabilitation, and replacement 10.0% <br /> Maintenance, rehabilitation,and replacement of property 10.0% <br /> directly behind Ventana Hills neighborhood <br /> Amortized value of initial Improvements constructed by 20.0% <br /> Developer <br /> Total City In-Kind Contributions 60.0% <br /> City of Pleasanton —� <br /> Bonde Ranch Landscape Maintenance District 2026-2 SCIConsultingGroup <br /> Public Finance Consulting Services <br /> Engineer's Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.