My WebLink
|
Help
|
About
|
Sign Out
RES 2026036
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2026 3:37:36 PM
Creation date
5/22/2026 3:37:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-036
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2026-036 <br /> Page 2 of 4 <br /> SECTION 1. The foregoing recitals are true and correct. <br /> SECTION 2. Amends the Streets CIP for FY 26/27, incorporating the following planned <br /> projects to be funded with Road Maintenance and Rehabilitation Account revenues: <br /> Annual Resurfacing and Reconstruction of Various Streets, CIP No. 27503. <br /> This project will resurface approximately 893,000 square feet of roadway pavement. Construction <br /> is scheduled to begin in spring 2027 and be completed by winter 2027. The resurfacing treatments <br /> are expected to extend the useful life of the treated roadway by an additional 10 to 15 years. The <br /> streets proposed for resurfacing with SB 1 funding are listed below. <br /> STREET NAME BEGIN LOCATION END LOCATION <br /> VINEYARD AVENUE 130 FEET EAST OF LEONA THIESSEN STREET (WEST) <br /> PLACE <br /> VINEYARD AVENUE THIESSEN STREET 1860 FEET EAST OF THIESSEN <br /> (WEST) STREET (WEST) <br /> VINEYARD AVENUE 1860 FEET EAST OF 1050 FEET EAST OF MACHADO <br /> THIESSEN STREET PLACE <br /> VINEYARD AVENUE 1050 FT EAST OF RUBY HILL BOULEVARD <br /> MACHADO PLACE <br /> VINEYARD AVENUE RUBY HILL BOULEVARD WEST OF ISABEL AVENUE <br /> VINEYARD AVENUE FIRST STREET BERNAL AVENUE <br /> SUNOL BOULEVARD VALLEY AVENUE / BERNAL AVENUE <br /> JUNIPERO STREET <br /> SYCAMORE ROAD SUNOL BOULEVARD SYCAMORE CREEK WAY <br /> Annual Slurry Sealing of Various Streets, CIP No. 27504 <br /> This project will slurry seal approximately 750,000 square feet of roadway pavement by applying <br /> a thin coat of asphalt-aggregate slurry to the existing pavement. Construction is scheduled to <br /> begin in September 2027 and be completed by October 2027. The slurry seal treatments are <br /> expected to extend the useful life of the treated roadway by an additional 6 to 8 years. The streets <br /> proposed for slurry sealing with SB 1 funding are listed below. <br /> STREET NAME BEGIN LOCATION END LOCATION <br /> AMBER LANE HAMILTON WAY 350 FEET NORTH OF <br /> HAMILTON WAY <br /> AMBER LANE HAMILTON WAY ROMEO COURT <br /> AMBER LANE ROMEO COURT CARRIAGE DRIVE <br /> MATTHEW COURT ARLINGTON DRIVE END <br />
The URL can be used to link to this page
Your browser does not support the video tag.