Laserfiche WebLink
New Capital Project(3 of 3) <br /> Sewer <br /> pi f <br /> Large Diameter Sewer Pipe . .. <br /> Inspection Study <br /> Project Number 27205 , a <br /> e <br /> Public Works- `' , j--i <br /> Department- Utilities&Environmental Service j <br /> Project Phase Design&Construction <br /> r <br /> Total Budget. $163,000 <br /> CIP Ranking Enterprise <br /> Score <br /> Protect Justification <br /> This project inspects large-diameter sewer pipes,often The 2025 Sewer System Management Plan requires <br /> 24 inches or larger,throughout the sewer system.The the City to inspect large diameter sewer mains <br /> condition assessment of large diameter sewer pipes throughout the sewer system and identify necessary <br /> requires specialized tools and technology to identify repairs to maintain system operability and reliability to <br /> defects and potential future improvements such as meet regulatory requirements. <br /> pipe replacements,pipe lining,point repairs,and <br /> mahole repairs. <br /> Project Funding <br /> Fund Description Funds Current Funding FY 2025/26 FY 2026/27 FY 2027128 FY 2028!29 FY 2029/30 <br /> Sewer 431 - $163,000 <br /> Replacement C1P <br /> 20 <br />