My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Master Responses <br />FirstCarbon Solutions 2-1 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/released/032626 DV/21480016 Sec02-00 Master Responses.docx <br />SECTION 2: MASTER RESPONSES <br />Master responses address similar comments made by multiple public agencies, businesses, <br />organizations, or individuals through written comments submitted to the City of Pleasanton. Master <br />responses are provided in the order in which they are referenced in Section 3. <br />2.1 - List of Master Responses <br />xx Master Response 1—Non-CEQA Issues Not Addressed in the Final EIR <br />x Master Response 2—General Opposition Comments Not Addressed in the Final EIR <br />2.2 - Master Responses <br />Master Response 1—Non-CEQA Issues Not Addressed in the Final EIR <br />Summary of Relevant Comments <br />Various comments received either (1) reference non-environmental issues outside of the scope of <br />recognized California Environmental Quality Act (CEQA) frameworks; or (2) relate to social, <br />economic, or general health and safety topics that are not project impacts related to the physical <br />environment and thus fall outside the scope of CEQA. Generally, these comments, referred to herein <br />collectively as “Non-CEQA Issues” involve, but are not limited to, the following topics: <br />x Economic effects or other similar perceived impacts related to property values, development <br />costs, taxation, maintenance costs, and infrastructure costs; <br />x New suggestions for elements of the proposed project or conditions of approval unrelated to <br />environmental topic areas; <br />x Document length; <br />x Traffic congestion; <br />x Non-project-related infrastructure concerns; or <br />x Social effects or other similar concerns related to the proposed project’s impact to community <br />culture. <br />These comments do not raise significant environmental issues or provide input about the <br />environmental analysis or conclusions in the Draft EIR. This Master Response addresses why these <br />Non-CEQA Issues are not further addressed in the Final EIR and confirms that these comments will <br />nonetheless be included in the administrative record and provided to City decision-makers for <br />consideration during the proposed project’s public hearing process. <br />Response <br />In compliance with CEQA, the Draft EIR evaluates the potential for the proposed project to adversely <br />impact the physical environment based upon an assessment of identified significance thresholds. <br />Under CEQA, the Lead Agency must evaluate comments on the Draft EIR and prepare written
The URL can be used to link to this page
Your browser does not support the video tag.