Laserfiche WebLink
softened the subgrade to the degree that the pavement structure is weakened and completely broken <br />up, see Figure 9. There is no mention of this unacceptable drainage situation in the DEIR, but it <br />must be corrected if the Hidden Canyon Residences and Preserve project is approved. It has a <br />direct bearing on the Vinson/EBRPD and Parking/staging area driveways and the parking/staging <br />area lot. Also, it is entirely conceivable that problems similar to this may occur for the proposed <br />project. <br />The proposed project will divert a significant amount of water from Devaney Creek. It is stated <br />in the report “the proposed projects bio retention areas would have sufficient stormwater capacity <br />to serve the proposed project, preventing surface runoff”. If this is the case, then in a normal year <br />10 acre-feet (or more) of runoff would not flow into Devaney Creek. (Based on the proposed <br />project increasing the impervious surface area by approximately 7.4 acres and an average annual <br />rainfall of 18 in,) The State Water Resources Control Board regulates the diversion of water from <br />“blue line” drainages in California. Devaney Creek is a “blue line” drainage. Have the developers <br />contacted the State Water Resources Control Board regarding the diversion of water they have <br />proposed? I have a 75+ year-old 2-acre lake/“stock pond“ on my property at the head of Devaney <br />Canyon. I divert a similar amount of runoff from Devaney Creek. I am regulated by the State <br />T. Vinson <br />Page 4 of 28 <br />5 <br />CONT <br />6