Laserfiche WebLink
Figure 6 Sign at the entry to the Trail at the top of the ridge which obviously implies that after <br />November 26, the Trail is open. Did the Trail Contractor or EBRPD place this sign? The answer <br />doesn’t matter as the Trail Contractor is EBRPD’s agent. Was the Trail Contractor ever informed <br />that the Trail would not be open in the foreseeable future? <br />T. Vinson <br />Page 22 of 28 <br />16 <br />CONT