My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Master Responses <br />City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR <br />2-4 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/released/032626 DV/21480016 Sec02-00 Master Responses.docx <br />those impacts (CEQA Guidelines § 15204(a)). “Reviewers should explain the basis for their <br />comments” and provide data, references, or other evidence to support their comments (CEQA <br />Guidelines § 15204(c)). <br />CEQA requires that the Final EIR address comments submitted during the public comment period <br />that raise significant environmental issues on the adequacy of the Draft EIR (PRC § 21091(d)(2)(B); <br />CEQA Guidelines § 15088(c)). CEQA considerations are limited to significant issues as these relate to <br />potential adverse physical impacts of the proposed project on the environment. General comments <br />and comments that consist merely of speculation or unsupported criticism may be rejected or <br />answered with only a general response. <br />CEQA Guidelines Section 15204, in part states: <br />xx In reviewing draft EIRs, persons and public agencies should focus on the sufficiency of the <br />document in identifying and analyzing the possible impacts on the environment and the ways <br />in which the significant effects of the project might be avoided or mitigated. . . . [R]eviewers <br />should be aware that the adequacy of an EIR is determined in terms of what is reasonably <br />feasible, in light of [specified] factors. . . . CEQA does not require a lead agency to conduct <br />every test or perform all research, study, and experimentation recommended or demanded by <br />commenters. When responding to comments, lead agencies need only respond to significant <br />environmental issues and do not need to provide all information requested by reviewers, as <br />long as a good faith effort at full disclosure is made in the EIR. (CEQA Guidelines § 15204(a)). <br />x Reviewers should explain the basis for their comments, and should submit data or references <br />offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in <br />support of the comments. Pursuant to Section 15064, an effect shall not be considered <br />significant in the absence of substantial evidence.” (CEQA Guidelines § 15204(c)). <br />Pursuant to CEQA, personal opinions expressing general support for, or opposition to, the proposed <br />project are noted and will be included within the administrative record for the proposed project for <br />consideration by the City, but do not require a specific written response if they do not relate to a <br />significant environmental issue that is addressed within the Draft EIR and/or otherwise within the <br />purview of CEQA. Likewise, opinions about the general desirability, merits, and/or purely economic, <br />social, or political considerations of the proposed project are not within the purview of CEQA and do <br />not require a specific written response in this Final EIR. See also Master Response 1, Non-CEQA <br />Issues Not Addressed in the Final EIR, above. <br />In cases where the commenter provides an opinion and/or generalized concerns about the merits of <br />the proposed project and/or the scope and nature of the environmental review but does not identify <br />any particular issue concerning the sufficiency of the Draft EIR, the City notes the opinion in this <br />Final EIR for informational purposes and consideration by the decision-makers as part of the public <br />hearing process on the merits of the proposed project. <br />Where a commenter offers unsubstantiated assertions about an environmental issue or the <br />adequacy of the Draft EIR, the City notes the assertion in this Final EIR for informational purposes
The URL can be used to link to this page
Your browser does not support the video tag.