My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Response to Public Meeting Verbal Comments <br /> <br /> <br />FirstCarbon Solutions 4-3 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec04-00 Response to Public Meeting Verbal Comments.docx <br />important that the stoplight be number one and not be put off to the end of the project. Also, if <br />we're shutting down the road for construction, we had a tree fall down and for me to get to my <br />residence, I had to go over to Dublin, take Dublin Road over to where the rodeo is and come around <br />to my place that way. That's the only way in and out. And uh we've also limited our access in the <br />preserve area. And with the construction coming up, I am very concerned that the stop lights maybe <br />be the first thing that the road construction be the first thing so that we can accommodate more <br />cars through there safely. So, uh thank you very much. And where can I see a more intricate map? Is <br />it online? . . . So if something has to be modified we could do that in advance? . . . So will we have <br />more time? On this notice it says everything has to be in by January 5th . . . So we will have more <br />time? Thank you very much. <br />Response to S.HOLLISTER <br />Pages 4, 5, and 6 in Appendix H of the Draft EIR include more detailed images of turn lanes and <br />roadway striping associated with the proposed project. Additionally, an image of the location of the <br />proposed traffic signal is displayed on Exhibit 2-7b on page 2-31 of the Draft EIR. Note that the <br />Exhibit is mislabeled and is corrected in this FEIR. See Section 5, Errata, for the corrected Exhibit. <br />Further, as noted by City staff during the Planning Commission public meeting, the complete <br />proposed project site plans are available for viewing upon request. <br />Also note that the comment period for the proposed project’s Draft EIR was extended from January <br />5, 2026, to January 20th, 2026. Further, comments on the design of the proposed project can be <br />given during the Planning Commission and City Council Hearings. This comment is included in the <br />administrative record and will be provided to the decision makers for review and consideration. The <br />comment did not provide new, substantial evidence with respect to the disposition of significant <br />environmental impacts evaluated in the Draft EIR. Therefore, no further response is required. <br />Sean Ghoddoucy (GHODDOUCY) <br />Hi. Uh, my name is Sean Ghoddoucy. I've been a resident of, uh, Crosby Drive in Pleasanton, which is <br />the in direct view of this project for 20 plus years. Um, I look at that beautiful green hill every day for <br />hours. That's where, uh, our family room is. That's where our kitchen is. That's where we our <br />bedroom windows are. And this is very concerning to me. I have um a handful of questions, not <br />necessarily comments. Can I just read them and then you guys could someone could answer them <br />whenever they can. Is that all right? . . . questions uh could turn into concerns if um the answers are <br />no . . . Sounds good. Um, is there going to be any exceptions to the uh grading and cut and fill <br />guidelines on this project? That's question one. Will there be uh required um clean energy solar <br />panels required to limit the amount of impact on the grid on these homes? Are there any plans to <br />add mature trees on the uh south edge of this project to uh limit the eyesore that I'll be staring at? . . <br />. Add mature trees to uh reduce the uh you know the ugliness of a of a project like this. Will there be <br />an additional fire road added? Um who will maintain it? Um will there be an HOA? I'm assuming <br />because it's gated there will be an HOA. And what is covered on that HOA for maintaining the um um <br />state of that project. Will there be a low income 55 older something like that which Pleasanton <br />needs um as part of this project? Um and uh alongside the traffic impact on on uh eastbound, um <br />that that road is extremely dangerous from 3 to 3 to 6:00 p.m. If you guys have ever been there, um I <br />suggest you find a different time to be there. Um what's the average square foot of the homes? I'm <br />sure it's in the plans. And what is the asking price? Um, and you guys had you guys addressed visual
The URL can be used to link to this page
Your browser does not support the video tag.