My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Response to Public Meeting Verbal Comments <br /> <br /> <br />FirstCarbon Solutions 4-5 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec04-00 Response to Public Meeting Verbal Comments.docx <br />asked to approve. This is desecration . . . Okay. Um, you need to see the damage you're being asked <br />to approve. Uh, this is desecration. Uh, back in 2019, Herb Ritter, a member of this commission, <br />came to see for himself, which I'm asking you to do. He then made it clear during that 2019 meeting <br />that the developer must try harder to minimize the visual blight. Some of these points were made at <br />that hearing. If the number of houses won't be reduced, and they should be, they should be less of <br />an eyesore. They should be single-story. The houses, roads, retaining walls should have earthtone <br />colors that blend into the hillside. Retaining walls should be planted and terraced and not so clearly <br />scar the hillsides. And the recent drawings that they have placed in the file show that they are so <br />high and so big, but that's because they have to do that because they can't otherwise flatten the hills <br />to make their paths. Mr. Mr. Ritter made it clear that tall and yes, mature trees, the size of the <br />heritage trees that are going to be removed must be planted around the development for visual <br />screening. There are power poles and power lines on the property that city staff has told me will be <br />or should be removed and undergrounded. There's also a plan to put pipes down the fire road from <br />Crosby Drive to Dublin Canyon Road. Well, if that's the case, then the developer or the city has to <br />repave that road and maintain it and the wooden fence along it. And if driveway to my house uh is <br />cut open for those pipes, that's going to have to be replaced. Uh any East Bay Regional Park <br />walkways and parking lot must be secured and monitored for fire safety. That hillside is an absolute <br />tinder box in the summer. Fire safety measures must be enforced. Now I know under current state <br />law and the housing element, this project won't be rejected in its entirety. But you have to <br />understand despite the fact that they have decreased the number, it is still too much. Too many <br />houses, too much grading and flattening of those hillsides, and there is much that can be done. I've <br />mentioned a few things to help mitigate it. Now, Ponderosa told us at the very first time we met with <br />them, that we are not like other developers. We care about and listen to and work with impacted <br />neighbors. And those are quotes, by the way. I was there and took notes. But I have to tell you, sadly, <br />nothing of the sort has taken place. There has been no communication, no collaboration, nothing <br />from Ponderosa. They know we're there. They can say visually it's unimportant. It is important to <br />some of us. So, I call upon Ponderosa. I'm sure they're not bad people, but to heed their own <br />promises, work with your neighbors to make this project as palatable as possible. You promised and <br />you failed. And I call upon the city to insist that they do so and create an imposed condition so that <br />their valuable rights and interests of current Pleasanton restaurant residents are not completely <br />ignored. Insist the developer try harder than it has to the extent that is tried at all to minimize the <br />blight they intend to bring to Pleasanton and to not ignore what already has been requested by the <br />city. Thank you. Okay. I'm sorry I went over my three minutes. They've had six years . . . <br />Response to A.GELB 2 <br />Please refer to Master Response 2, General Opposition Comments Not Addressed in Final EIR, in <br />Section 2, Master Responses, of this document. This Master Response provides a response to <br />comments that express general comments on the proposed project or the environmental analysis. <br />Please also refer to the Response to A. GELB 1-1 through the Response to A. GELB 1-6 for a <br />discussion of aesthetic impacts related to development of the proposed project, including the City’s <br />ridgeline. As stated by the project applicant at the Planning Commission public meeting, the <br />proposed project development has been designed to fit into the allowable envelope to meet <br />Measures PP and QQ. This is also discussed in Draft EIR Chapter 2, Project Description at pages 2-19 <br />and 2-20.
The URL can be used to link to this page
Your browser does not support the video tag.