Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Errata <br /> <br /> <br />FirstCarbon Solutions 5-17 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec05-00 Errata.docx <br />large specimens. If no significant specimens are encountered during ground <br />disturbing activities, full time monitoring can be reduced to spot-checking or <br />suspended entirely, at the discretion of the qualified professional Paleontologist and <br />the City/Lead Agency. <br />MM GEO-26d The Paleontological Monitor shall keep a daily log and photographic record of all <br />activities involving ground disturbance during the construction phase, as well as <br />adhering to the procedures outlined in the Paleontological Resource Impact <br />Mitigation Monitoring Program (PRIMMP). The Monitor’s daily activities, findings, <br />etc. shall be submitted to the Principal Paleontologist. All relevant details and <br />findings shall be summarized in a report that shall be prepared at the completion of <br />ground-disturbing activities and submitted to the City/Lead Agency and UCMP <br />repository. Additionally, specimens shall be identified and curated into a permanent <br />accredited repository (such as the University of California Museum of Paleontology <br />[UCMP]) with permanent curation and retrievable storage. <br />3.12–Public Services <br />3.12-1 <br />Additional information was provided through correspondence with the Livermore-Pleasanton Fire <br />Department (LPFD) and the Pleasanton Police Department (PPD) (Appendix H). <br />3.13–Recreation <br />3.12-1 <br />The proposed project would include a staging area and a trail connection to EBRPD Pleasanton Ridge <br />Regional Park. (Exhibit 2-2b7d) The staging area would consist of a parking lot with trailer stalls, a <br />drinking fountain and horse trough, and a vault restroom. <br />5.3–Mandatory Findings of Significance <br />5-4 <br />Potentially significant cumulative impacts related to Biological Resources, Cultural and Tribal Cultural <br />Resources, Geology and Soils, and Hazards would be mitigated to less than significant levels with the <br />implementation of MM BIO-1a through MM BIO-5; MM CUL-2 and MM CUL-3; MM GEO-1 and MM <br />GEO-26a through GEO-26d; and MM HAZ-1. <br />6.3.1–Impact Analysis <br />6-4 <br />Cumulative impacts would be less than significant without mitigation. Impacts related to aesthetics, <br />light, and glare for the proposed project would be less than significant with implementation of MM <br />AES-4a.