Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 7 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />It is the City’s intent that the Final EIR and the adopted Findings be relied upon to the fullest extent <br />permitted by law in connection with the issuance of any permits or approvals necessary to <br />effectuate the proposed project. <br />1.4 - Background <br />The City of Pleasanton released a Notice of Preparation (NOP) of an environmental impact report for <br />public review from August 28, 2019 to September 26, 2019 (30-day review period). The NOP and <br />copies of comments received are included as Appendix A to the Draft EIR. <br />On September 11, 2019, a scoping meeting was held at the City Council Chambers located at 200 Old <br />Bernal Avenue, Pleasanton, CA 94566-0802. The meeting was held at 7:00 p.m. during which <br />individuals and organizations/agency representatives were invited to provide oral comments on the <br />scope of the Draft EIR. Many comments received during the NOP scoping period addressed concerns <br />suggesting further evaluation on significant environmental impacts, including impacts on scenic <br />hillside views, proposed circulation patterns, existing agricultural uses, traffic congestion, geometric <br />design hazards, driver safety, pedestrian safety, stormwater runoff, and soil instability resulting from <br />proposed hillside grading activities. <br />The Draft EIR was prepared and circulated for an extended 60-day public review period between <br />November 21, 2025 and January 20, 2026. The Draft EIR was publicly available at the City Council <br />Chambers on 200 Old Bernal Avenue, Pleasanton, CA 94566-0802. The Draft EIR was also posted on <br />the City of Pleasanton Community Development Department website at <br />https://www.cityofpleasantonca.gov/our-government/community-and-economic- <br />development/short-range-projects/ during the public review period. <br />A public meeting was held on December 10, 2025, at 7:00 p.m. at the City Council Chambers on 200 <br />Old Bernal Avenue, Pleasanton, CA 94566-0802 during which individuals and organizations/agency <br />representatives were invited to provide oral comments on the EIR. <br />The City of Pleasanton prepared a Final EIR, consisting of the comments received on significant <br />environmental issues, written responses to those comments, and an Errata making minor, non- <br />substantive changes to the Final EIR. <br />The City of Pleasanton subsequently considered all oral and written comments regarding <br />environmental issues in the Final EIR and determined, based on all of the evidence presented, <br />including but not limited to the EIR, written and oral testimony given at public meetings and <br />hearings in connection therewith, and the submission of comments from the public, organizations <br />and regulatory agencies, as well as all other relevant information in the administrative record, the <br />following environmental impacts associated with the proposed project are: (1) less than significant <br />and do not require mitigation; or (2) potentially significant but will be avoided or reduced to a level <br />of insignificance through the identified mitigation measures; or (3) significant and cannot be fully <br />mitigated to a level of less than significant but will be substantially lessened to the extent feasible by <br />the identified mitigation measures.