My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2026-039 <br /> Page 2 of 4 <br /> WHEREAS, the Planning Commission reviewed a Staff Report dated December 10, 2025, <br /> and the Draft EIR at a noticed study session on December 10, 2025, during the 60-day comment <br /> period; and <br /> WHEREAS, the public and the Planning Commission had the opportunity to present <br /> written and oral comments on the Draft EIR at the Planning Commission study session on <br /> December 10, 2025; and <br /> WHEREAS, the City received comment letters from public agencies as well as interested <br /> individuals and organizations during the public review period. In accordance with the California <br /> Environment Quality Act (CEQA), the City prepared written responses to all the comments <br /> received during the public review period, both oral and written. The City prepared a Final EIR <br /> dated March 2026 labeled Attachment 1 included hereto and made a part hereof. The Final EIR <br /> included an annotated copy of each comment letter identifying specific comments, responses to <br /> each specific comment, and clarifications and minor corrections to information presented in the <br /> Draft EIR. The responses to comments provide the City's good faith, reasoned analysis of the <br /> environmental issues raised by the comments; and <br /> WHEREAS, information was generated in the course of preparing written responses for <br /> the Final EIR. The City carefully reviewed both the comments and the written responses to assess <br /> whether they constituted significant new information that would require recirculation of the Draft <br /> EIR under the standards in CEQA Guidelines Section 15088.5. After its review, the City <br /> determined that the Final EIR, including the comments, clarifications, and minor corrections to the <br /> Draft EIR, do not constitute significant new information requiring recirculation of the Draft EIR; <br /> and <br /> WHEREAS, the Final EIR was posted on the City's website on April 15, 2026, and <br /> referenced in the public notice for the April 22, 2026, Planning Commission public hearing; and <br /> WHEREAS, a staff report, dated April 22, 2026, and incorporated herein by reference, <br /> described and analyzed the Project and related Draft and Final EIRs for the Planning <br /> Commission; and <br /> WHEREAS, the Planning Commission reviewed the staff report, and the Draft and Final <br /> EIRs at a noticed public hearing on April 22, 2026, at which time all interested parties had the <br /> opportunity to be heard; and <br /> WHEREAS,the Draft and Final EIRs, reflect the City's independent judgment and analysis <br /> on the potential for environmental impacts and constitute the Environmental Impact Report for the <br /> Project; and <br /> WHEREAS, the EIR identified several potentially significant impacts that will be reduced <br /> to a less than significant level with specified mitigation measures. Approval of the Project by the <br /> City Council will therefore require adoption of findings on impacts and mitigations and a Mitigation <br /> Monitoring and Reporting Program, which is included in Attachment 2 attached hereto and made <br /> a part hereof; and <br /> WHEREAS, the EIR identified a significant and unavoidable environmental impact of the <br /> Project. Approval of the Project by the City Council will therefore require adoption of Alternative <br />
The URL can be used to link to this page
Your browser does not support the video tag.