My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 23 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />surveyed with walking transects within 2 days prior to the onset of construction. <br />This survey can be conducted in conjunction with other pre-construction surveys. <br />Tailgate Training <br />All workers on the project and access corridor shall attend a tailgate training that <br />includes a description of the species, summary of its biology, and minimization <br />measures and instructions on what to do if a ringtail is observed. <br />Protective Measures for Individuals <br />In the event an individual is discovered within a construction zone on-site, <br />construction would be halted until the individual self-relocates from the project site. <br />A ringtail would not be expected to be residing within the area of development; <br />therefore, self-relocation is believed to be inevitable. Once the Biologist has <br />determined that the animal has moved outside of potential danger, construction <br />activities could resume. If the ringtail is found to be residing within a construction <br />zone on-site, an appropriate construction-free buffer (to be determined by a <br />qualified Biologist) would be established around the area being used by the ringtail <br />until the nest is abandoned by adult(s) and young for the year (approximately after <br />September). <br />MM BIO-1i Avoidance and Minimization Measures for Burrowing Owls <br />To avoid potential impacts to active burrowing owl nests and adult owls, a qualified <br />Biologist shall conduct pre-construction surveys for burrowing owls within the <br />construction footprint and within 250 feet of the footprint no more than 7 days prior <br />to project ground disturbance during the early part of breeding season (i.e., <br />February 1 through April 30), and no more than 30 days prior to onset of ground <br />disturbance during any other times of year. These surveys shall be conducted in a <br />manner consistent with accepted burrowing owl survey protocols. Specific <br />Avoidance and Minimization Measures for the burrowing owl are reported in Table <br />3-3 of the East Alameda County Conservation Strategy (EACCS). These measures are <br />mandatory for mitigation and include: <br />xx If an active nest is identified near a proposed work area work will be conducted <br />outside of the nesting season (March 15 to September 1). <br />x If an active nest is identified near a proposed work area and work cannot be <br />conducted outside of the nesting season, a no-activity zone shall be established <br />by a qualified Biologist. The no-activity zone shall be large enough to avoid nest <br />abandonment and will at a minimum, be 250-feet radius from the nest. <br />x If the burrowing owls are present at the project site during the nonbreeding <br />period, a qualified Biologist shall establish a no-activity zone of at least 150 feet. <br />x If an effective no-activity zone cannot be established in either case, an <br />experienced burrowing owl Biologist shall develop a site-specific plan (i.e., a plan <br />that considers the type and extent of the proposed activity, the duration and <br />timing of the activity, the sensitivity and habituation of the owls, and the
The URL can be used to link to this page
Your browser does not support the video tag.