Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />28 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />xx Provide for surety in funding for MMP and for in-perpetuity preservation and <br />management of created wetland habitats. <br /> <br />Facts in Support of Findings: The proposed project would preserve approximately 104.6 acres of <br />open space for conservation purposes, including riparian habitat and corridors that would be <br />considered a sensitive natural community. (Draft EIR, p. 3.3-28). The proposed project would <br />construct an 18-inch and a 24-inch outfall that would drain into the west and east sides of Devany <br />Creek and would be designed to be above the ordinary high water mark (OHWM). However, as a <br />precautionary measure in case the OHWM is exceeded and 0.03 to 0.06 acre of riparian habitat are <br />impacted, the proposed project would implement MM BIO-3. Implementation of MM BIO-3 would <br />include minimization measures and compensation measures, including a Mitigation and Monitoring <br />Plan (MMP) for identifying and creating riparian/seasonal wetland habitat equal or of greater quality <br />than the riparian/seasonal wetland habitats being impacted. Through implementation of MM BIO-3, <br />the proposed project would reduce impacts on riparian habitat to less than significant. <br />The Lead Agency finds that MM BIO-3 is feasible, is adopted, and will further reduce impacts related <br />to riparian habitats. Accordingly, the Lead Agency finds that, pursuant to Public Resources Code <br />Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or alterations have been <br />required in, or incorporated into, the proposed project that mitigate or avoid the potentially <br />significant impacts as identified in the EIR. Therefore, impacts associated with riparian habitats <br />would be less than significant with mitigation incorporated. <br />1.6.4 - Impact BIO-3: Wetlands and Jurisdictional Features <br />Impact BIO-3: The proposed project would not have a substantial adverse effect on State or federally <br />protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct <br />removal, filling, hydrological interruption, or other means. <br />Findings: Less than significant impact with mitigation incorporated. (Draft EIR, p. 3.4-43). <br />Changes or alterations have been required in, or incorporated into, the project <br />which avoid or substantially lessen the significant environmental effects as identified <br />in the EIR. (CEQA Guidelines § 15091(a)(1)). <br />Mitigation Measures <br />Implement MM BIO-3. <br />Facts in Support of Findings: The proposed project is sited to avoid and minimize impacts to Devany <br />Creek and its unnamed tributary to the fullest extent feasible. However, approximately 0.25 acre of <br />seasonal wetlands on the northern portion of the site near the entrance on Dublin Canyon Road <br />would be affected. (Draft EIR, p. 3.3-41). Although the proposed project would be required to obtain <br />a compulsory permit from the Regional Water Quality Control Board (RWQCB) and the United States <br />Army Corps of Engineers (USACE), out of an abundance of caution, the proposed project would <br />implement MM BIO-3. As previously mentioned, implementation of MM BIO-3 would require the <br />preparation of an MMP for identifying and creating riparian/seasonal wetland habitat equal or of <br />greater quality than the riparian/seasonal wetland habitats being impacted. Through