Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />38 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />The Lead Agency finds that MM GEO-1 is feasible, is adopted, and will further reduce impacts related <br />to expansive soil. Accordingly, the Lead Agency finds that, pursuant to Public Resources Code Section <br />21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or alterations have been required in, <br />or incorporated into, the proposed project that mitigate or avoid the potentially significant impacts <br />as identified in the EIR. Therefore, impacts associated with expansive soil would be less than <br />significant with mitigation incorporated. <br />1.6.12 - Impact GEO-6: Paleontological Resources <br />Impact GEO-6: The proposed project would not directly or indirectly destroy a unique <br />paleontological resource or site or unique geologic feature. <br />Findings: Less than significant impact with mitigation incorporated. (Draft EIR, p. 3.6-35). <br />Changes or alterations have been required in, or incorporated into, the project <br />which avoid or substantially lessen the significant environmental effects as identified <br />in the EIR. (CEQA Guidelines § 15091(a)(1)). <br />Mitigation Measures <br />MM GEO-6a Prior to the issuance of grading permits, the project proponent/developer shall <br />demonstrate the retention of the services of a qualified professional Paleontologist <br />as defined by the Society of Vertebrate Paleontology (SVP). The qualified <br />Paleontologist shall prepare a Paleontological Resource Impact Mitigation <br />Monitoring Program (PRIMMP). The project proponent/developer shall submit the <br />PRIMMP to and receive approval from the City/Lead Agency. The PRIMMP will <br />describe, in addition to industry standards and SVP standards, the level of <br />monitoring required in the project area, qualifications of the Paleontological monitor <br />for grading operations, and identification of personnel with authority and <br />responsibility to temporarily halt or divert grading equipment to allow for recovery <br />of large specimens. Furthermore, the PRIMMP shall provide direction for any fossil <br />discoveries to be immediately reported, means and methods to be employed to <br />quickly salvage fossils as they are unearthed to avoid construction delays, sampling <br />procedures and protocol for collecting and processing sediments and specimens, <br />fossil identification, and reporting and curation procedures to be employed. The <br />report will include the paleontological records search conducted at the UCMP, <br />pertinent exhibits, maps and reference procedures for reporting of findings. <br />MM GEO-6b On the first day of ground disturbance and prior to the start of any ground- <br />disturbing activities, the qualified professional Paleontologist that meets SVP <br />Standard Procedures shall prepare and conduct a project-wide Worker <br />Environmental Awareness Program (WEAP) training. The WEAP training shall include <br />a review of applicable federal, State, and local regulations related to paleontological <br />resources; recognition and understanding of significant paleontological resources <br />pertinent to the geography and geology of the region and the types of <br />paleontological resources that may be encountered; procedures to be followed in <br />the event that such resources are encountered; the protocols that apply in the event