My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 43 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />feasible VMT reduction strategies, the proposed project’s impacts would remain significant and <br />unavoidable. (Draft EIR, p. 3.14-15). <br />The Lead Agency finds that there are no project-specific feasible mitigation measures or project <br />design features that would reduce impacts and that impacts would remain significant and <br />unavoidable. <br />Cumulative Transportation and Traffic Impact: The proposed project would have a cumulatively <br />considerable contribution to VMT. <br />Findings: Changes or alterations have been required in, or incorporated into, the project <br />which avoid or substantially lessen the significant environmental effects as identified <br />in the EIR. (CEQA Guidelines § 15091(a)(1)). However, impacts would still remain <br />significant and unavoidable even with mitigation incorporated. (Draft EIR, p. 3.14- <br />18). Specific economic, legal, social, technological, or other considerations, including <br />provision of employment opportunities for highly trained workers, make infeasible <br />the mitigation measure or project alternatives identified in the EIR. (CEQA <br />Guidelines § 15091(a)(3)). <br />Mitigation Measures <br />There are no feasible mitigation measures. <br />Facts in Support of Findings: The proposed project would have a cumulatively considerable <br />contribution to VMT. All other cumulative impacts related to transportation and traffic would be less <br />than significant, as discussed below. <br />With respect to Impact TRANS-1, the proposed project would not have a significant impact on the <br />circulation system. Moreover, other past, present and reasonably foreseeable development would <br />be required to demonstrate consistency with applicable plans, programs and ordinances which <br />would reduce potential cumulative impacts to below a level of significance. There is no development <br />planned in the project vicinity and past and existing development within the geographic context <br />would be required to comply with these policies. Because of the proposed project’s proposed <br />improvements, which include the striping of 6-foot-wide bike lanes on both sides of Dublin Canyon <br />Road and the construction of sidewalks along Dublin Canyon Road and the project site’s internal <br />private streets, the proposed project is considered part of the cumulative solution toward meeting <br />the City’s long-range transportation goals. (Draft EIR, p. 3.13-17). Therefore, the proposed project <br />would not have a cumulatively considerable contribution to cumulative impacts. (Draft EIR, p. 3.13- <br />17). <br />With respect to Impact TRANS-3, the geographic context for potential cumulative impacts on hazards <br />from design features or incompatible uses are specific to the project vicinity (e.g., site access, sight <br />distance, etc.). There are no cumulative projects within a two-mile radius of the project vicinity; <br />therefore, cumulative impacts from the proposed project would not combine with those of other <br />projects. (Draft EIR, p. 3.14-18). The proposed project and other past, present, and reasonably <br />foreseeable future projects would be required to comply with local standard requirements for
The URL can be used to link to this page
Your browser does not support the video tag.