Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 45 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />Lester Family residences and dedication of land to the EBRPD, parking improvements, or <br />improvements to the Oak Hills Congregational Church access would occur. No improvements <br />to Dublin Canyon Road, including the traffic signal and turn lane, would be constructed. <br />xx Alternative 3–Alternative Site: The Alternative Site Alternative (Alternative 3) would utilize a <br />different project site based on the sites identified in the City of Pleasanton 2023-2031 Housing <br />Element Sites Inventory, Site 26 – St. Augustine (Site 26). Site 26 was selected as the <br />alternative site due to its potential to accommodate 28 residential units and the absence of <br />any other entitlement applications. Rezoning of Site 26 would be required. Alternative 3 <br />would include the construction of 28 new detached single-family residential units, where <br />operations are anticipated to be the same as the proposed project. Because of its location, <br />Alternative 3 would not involve implementation of a new public trailhead, traffic signal, water <br />pump, or road improvements. Furthermore, no demolishment of the two existing Lester <br />Family homes or the annexation of the 2.5-acre church site and associated parking lots would <br />occur. <br /> <br />In accordance with CEQA Guidelines Section 15126.6, the Draft EIR contained a comparative impact <br />assessment of alternatives to the proposed project. (See e.g., Draft EIR, Table 6-1, Summary of <br />Alternatives). The primary purpose of this analysis is to provide decision-makers and interested <br />agencies, organizations and individuals with information about a reasonable range of potentially <br />feasible project alternatives, which could avoid or reduce any of the proposed project’s significant <br />adverse environmental effects. Important considerations for these alternatives analyses are noted <br />below: <br />x An EIR need not consider every conceivable alternative to a project; <br />x An EIR should identify alternatives that were considered by the lead agency, but rejected as <br />infeasible during the scoping process; <br />x Reasons for rejecting an alternative include: <br />- Failure to meet most of the basic project objectives identified in Section 1.3.2; <br />- Infeasibility; and <br />- Inability to avoid significant environmental effects. <br /> <br />Alternative 1: No Project/No Build Alternative: <br />Under the No Project/No Build Alternative (Alternative 1), the proposed project would not be <br />constructed and existing operations on the project site would continue at the capacity of existing on- <br />site buildings and infrastructure. No new grading or development would occur, potentially resulting <br />in lower environmental impacts. <br />As such, this alternative would result in lesser impacts with respect to aesthetics, light, and glare; air <br />quality; biological resources; cultural resources and tribal cultural resources; energy; geology, soils, <br />and seismicity; greenhouse gas emissions; hazards and hazardous materials; hydrology and water <br />quality; land use and planning; noise; population and housing; public services; recreation; utilities <br />and services systems; roadway safety hazards; emergency access; bicycle, pedestrian, and transit <br />facilities; and wildfire.