My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Responses to Written Comments <br />FirstCarbon Solutions 3-21 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />Department of Toxic Substances Control 2 (DTSC 2) <br />Response to DTSC 2-1 <br />This comment is included in the administrative record. This comment will be provided to the <br />decision-makers for review and consideration. The comment did not provide new, substantial <br />evidence with respect to the disposition of significant environmental impacts evaluated in the Draft <br />EIR. Therefore, no further response is required. <br />Response to DTSC 2-2 <br />As stated in Draft EIR Section 3.8, Hazards and Hazardous Materials, page 3.8-3 and 3.8-4, of the <br />Draft EIR, the project site is primarily undeveloped, is not located on a site which is included on a list <br />of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and has no <br />areas of concern on the project site identified by DTSC’s EnviroStor. The project site has been used as <br />rangeland for cattle grazing since the early 1900s. This comment is noted and is included in the <br />administrative record. <br />The Draft EIR adequately addresses hazards and hazardous materials consistent with CEQA. DTSC’s <br />recommendations are acknowledged and will be incorporated into project implementation, as <br />applicable, through compliance with existing regulatory programs and site-specific investigation and <br />mitigation, should previously unidentified contamination be discovered. The commenter’s <br />recommendations will be provided to the Lead Agency and the project applicant for further <br />consideration. This comment did not provide new, substantial evidence with respect to the <br />disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, no further <br />response is required. <br />Response to DTSC 2-3 <br />As noted in Draft EIR Chapter 2, Project Description, page 2-54, the proposed project would not <br />require the off-haul or import of dirt for construction activities. The commenter’s recommendations <br />will be provided to the Lead Agency and the project applicant for further consideration. This <br />comment is included in the administrative record. This comment did not provide new, substantial <br />evidence with respect to the disposition of significant environmental impacts evaluated in the Draft <br />EIR. Therefore, no further response is required <br />Response to DTSC 2-4 <br />This comment is noted and is included in the administrative record. The commenter’s <br />recommendations will be provided to the Lead Agency and the project applicant for further <br />consideration. This comment did not provide new, substantial evidence with respect to the <br />disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, no further <br />response is required
The URL can be used to link to this page
Your browser does not support the video tag.