My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Responses to Written Comments Final EIR <br />3-46 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />evidence with respect to the disposition of significant environmental impacts evaluated in the Draft <br />EIR. Therefore, no further response is required. <br />Response to A.GELB 1-3 <br />The proposed project has changed since 2019. As noted in Draft EIR Chapter 2, Project Description, <br />page 2-27, the proposed project would preserve 117.1 acres of open space on the approximately <br />130.98-acre project site. Development would only occur on approximately 23.89 acres of the project <br />site. In an effort to preserve scenic hillsides and ridge views, the City’s General Plan discourages <br />grading to construct residential structures on slopes of 25 percent or greater under Program 20.3 <br />and Measure PP. The proposed project would include the approximately 23.89 acres of development <br />within the lower topographic portion of the project site and would not include development on 25 <br />percent or greater slopes, consistent with General Plan Program 20.3 and Measure PP. Additionally, <br />as explained on Draft EIR page 2-54, grading on the project site has been designed to avoid potential <br />impacts to Devany Creek and its associated vegetation and to provide a transition to the natural <br />grades beyond the building envelopes. Exhibit 2-9 on page 2-41 in the Draft EIR displays the grading <br />plan for the proposed project. <br />Moreover, as stated on Draft EIR page 3.1-11, the proposed project would provide landscaping and <br />trees that would enhance views of the project site and promote harmony with the existing <br />landscape. Overall, the proposed project would be consistent with the City’s hillside regulations <br />established in the General Plan and Municipal Code. This comment is included in the administrative <br />record and will be provided to the decision-makers for review and consideration. The comment did <br />not provide new, substantial evidence with respect to the disposition of significant environmental <br />impacts evaluated in the Draft EIR. Therefore, no further response is required. <br />Response to A.GELB 1-4 <br />Please refer to Master Response 2, General Opposition Comments Not Addressed in Final EIR, in <br />Section 2, Master Responses, of this document. This Master Response provides a response to <br />comments that express general comments on the proposed project or the environmental analysis. <br />Draft EIR Chapter 4, Effects found Not to be Significant, page 4-2 and 4-3 states that the project site <br />was evaluated as a Housing Opportunity site under the City’s 6th Cycle Housing Element Update and <br />associated Housing Element Update Program EIR. The Housing Element Update proposed updates to <br />the project site’s zoning district to allow for 31 dwelling units on the Hidden Canyon project site to <br />support the City in meeting its Regional Housing Needs Assessment (RHNA) requirements. The <br />proposed project would include the development of 28 dwelling units and the reconstruction of two <br />existing homes, which would be consistent with the zoning evaluated in the City’s Housing Element <br />Update. <br />As discussed in Draft EIR Chapter 2, Project Description, page 2-54, grading on the project site would <br />be balanced and neither off-haul nor import of soil would be required. Additionally, grading on the <br />development site and open space has been designed to avoid potential impacts to Devany Creek and <br />associated vegetation and to provide a transition to the natural grades beyond the building <br />envelopes. The proposed project would also incorporate the geotechnical recommendations <br />resulting from the design-level geotechnical investigation in accordance with Mitigation Measure
The URL can be used to link to this page
Your browser does not support the video tag.