My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Responses to Written Comments <br /> <br /> <br />FirstCarbon Solutions 3-53 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />Anonymous (ANONYMOUS) <br />Response to ANONYMOUS-1 <br />This comment provides general introductory statements and does not raise any specific issues with <br />respect to the proposed project or the Draft EIR. Please refer to Master Response 1, Non-CEQA <br />Issues Not Addressed in Final EIR, in Section 2, Master Responses, of this document. This Master <br />Response provides an explanation of the scope of CEQA, including conditions of approval. <br />Cumulative impacts for each environmental resource topic were evaluated at the end of each <br />environmental topic section of the Draft EIR. The Draft EIR determined that cumulative impacts <br />resulting from development of the proposed project would be less than significant with the <br />exception of transportation impacts related to VMT, which would be significant and unavoidable. <br />However, as stated in Draft EIR Section 3.14, Transportation, on page 3.14-13, the proposed project <br />would include VMT-reducing strategies such as reducing off-street parking spaces and enhancing <br />multimodal infrastructure. Moreover, this impact determination is consistent with the conclusions of <br />the City’s Housing Element Update EIR. The comment does not identify any specific cumulative <br />impact with which the commenter disagrees, nor does it propose any mitigation measures. This <br />comment is included in the administrative record and will be provided to the decision-makers for <br />review and consideration. The comment did not provide new, substantial evidence with respect to <br />the disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, no further <br />response is required. <br />Response to ANONYMOUS-2 <br />Please refer to Master Response 1, Non-CEQA Issues Not Addressed in Final EIR, in Section 2, Master <br />Responses, of this document. This Master Response provides an explanation of the scope of CEQA. <br />The comment raises general concerns regarding cumulative increases in traffic, noise, and <br />neighborhood activity, but does not identify any specific CEQA threshold that would be exceeded or <br />provide substantial evidence of a significant cumulative impact. As discussed in Draft EIR Sections <br />3.11, Noise, and 3.14, Transportation, the Draft EIR evaluates existing conditions, including <br />background traffic and infrastructure-related noise, and analyzes both project-level and cumulative <br />impacts using adopted significance criteria. The analysis concludes that cumulative traffic and noise <br />impacts would not be significant, and the project’s contribution would not be cumulatively <br />considerable. The comment does not provide new or substantial evidence requiring revision of the <br />Draft EIR’s conclusions. <br />However, a Transportation Impact Study was prepared for the proposed project and included as <br />Appendix H (erroneously labeled ‘Noise Supporting Information;’ refer to Section 5, Errata, of this <br />document) of the Draft EIR. While not required under CEQA, this report included an Level of Service <br />(LOS) analysis. Appendix H includes count sheets conducted to collect existing peak-hour traffic <br />volumes. As stated on page 7 in Appendix H of the Draft EIR, motor vehicle traffic impacts resulting <br />from the proposed project were found to be less than significant based on the City’s LOS standards. <br />The anticipated proposed project traffic would result in roughly a 3 percent increase in peak-hour <br />traffic on Dublin Canyon Road at the Canyon Meadows Drive intersection, which would not <br />significantly affect existing conditions. All study intersections were found to operate at an acceptable <br />LOS under all study scenarios, with and without the proposed project, and traffic conditions resulting
The URL can be used to link to this page
Your browser does not support the video tag.