Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Responses to Written Comments Final EIR <br /> <br /> <br />3-68 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />was to provide an additional opportunity for members of the public to provide oral comments and <br />ask questions, not to limit or replace the opportunity to submit written comments. Written <br />comments received by the close of the public review period are considered equally, regardless of <br />whether they are submitted before or after a public hearing. Accordingly, the timing of the public <br />hearing did not limit the public’s opportunity to review the Draft EIR or to provide comments, and <br />the City’s review process complies with CEQA requirements. Please refer to Section 4, Response to <br />Public Meeting Verbal Comments, of this document for a transcript of the meeting and for written <br />responses to all public speakers. Moreover, the City Council hearing date for the proposed project is <br />scheduled on May 19, 2026. Members of the public would be able to provide comment at this <br />meeting as well. This comment is included in the administrative record and will be provided to the <br />decision-makers for review and consideration. The comment did not provide new, substantial <br />evidence with respect to the disposition of significant environmental impacts evaluated in the Draft <br />EIR. Therefore, no further response is required. <br />Response to R.DEVANY 1-5 <br />Under CEQA Guidelines Section 15105, a Draft EIR must be circulated for a minimum public review <br />period of 45 days. The review period began on November 11, 2025, and was extended 15 days <br />beyond the statutory 45-day period from January 5th, 2026, to January 20th, 2026. As stated in <br />CEQA Guidelines Section 15105, “[t]he public review period for a Draft EIR shall not be less than 30 <br />days nor should it be longer than 60 days except under unusual circumstances.” The Draft EIR was <br />circulated for a 60-day public review period, and there is no evidence of unusual circumstances that <br />would justify a departure from the standard requirements set forth in the CEQA Guidelines. <br />An analysis of land use impacts related to the proposed project for each required CEQA threshold <br />was provided in Draft EIR Section 3.10, Land Use and Planning, pages 3.10-10 through 3.10-13. With <br />approval of the proposed General Plan Amendment, the proposed project would not conflict with <br />the City’s General Plan and impacts related to land use and planning would be less than significant. <br />Further, evaluation of wildfire impacts for each required CEQA threshold was provided in Draft EIR <br />Section 3.16, Wildfire, pages 3.16-11 through 3.16-16. With implementation of MM GEO-1 to reduce <br />post-fire slope instability, the proposed project would have a less than significant impact related to <br />wildfire. This comment is included in the administrative record and will be provided to the decision- <br />makers for review and consideration. The comment did not provide new, substantial evidence with <br />respect to the disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, <br />no further response is required. <br />Response to R.DEVANY 1-6 <br />Notice of Preparation comments and comments received at the public scoping meeting for the <br />proposed project are summarized in Table 1-1, NOP Comment Letters, in Section 1, Introduction, of <br />the Draft EIR. Since the NOP comment scoping period, changes have been made to the Draft EIR, <br />including the preparation of visual simulation exhibits for the Draft EIR, which are available in Draft <br />EIR Section 3.1; Aesthetics, Light, and Glare, pages 3.1-9 through 3.1-13. Additionally, the <br />construction of a traffic signal, bicycle lanes, and sidewalks on Dublin Canyon Road were included as <br />part of the proposed project. Please see the Response to R.DEVANY 1-1 for a discussion of adjoining <br />parcel access. This comment is included in the administrative record and will be provided to the