Laserfiche WebLink
Page 2 of 15 <br />RECOMMENDATION <br />Approve the proposed sewer rate structure, sewer rates, and updated sewer connection fees <br />needed to implement the Rate Study Financial Plan’s Scenario 1 – Maintain, including: <br />1. Update the sewer rates for condominium and multifamily homes to be the same, <br />consistent with DSRSD methodology; <br />2. Revise the sewer rate methodology for commercial and industrial customers to align <br />with DSRSD by providing one collection rate regardless of business classification; and <br />3. Continue differentiating between non-submetered and submetered Pleasanton Unified <br />School District customers. <br /> <br /> <br />BACKGROUND <br />The City owns and operates a sewer collection system consisting of approximately 253 miles <br />of gravity sewers, 4.9 miles of force mains, eight siphons, 11 active pump stations, and <br />approximately 21,000 service connections. Average dry-weather flow is approximately 6 million <br />gallons per day (MGD). <br /> <br />The City has agreements with the Dublin San Ramon Services District (DSRSD) and the City <br />of Livermore, for the Ruby Hill service area, for wastewater treatment and is a member of the <br />Livermore-Amador Valley Water Management Agency (LAVWMA) for disposal of treated <br />wastewater. The City also has an agreement with Alameda County, which allows sewage flows <br />from the County’s Castlewood Service Area to be conveyed through the City’s collection <br />system for treatment at DSRSD. <br /> <br />Historically, the City has relied on Consumer Price Index (CPI) increases to raise sewer <br />revenue. This approach has not generated the resources needed to adequately maintain and <br />rehabilitate aging infrastructure or keep up with increasing operational and regulatory <br />demands. As a result, operating costs have been withdrawing from the sewer enterprise fund <br />balance every year. With aging infrastructure experiencing higher failure rates and increasing <br />regulatory requirements, it is very important that the City establish a justifiable sewer rate that <br />supports the system's critical infrastructure needs in the coming years and meets State <br />regulatory requirements for managing the sanitary sewer system. <br /> <br />On June 17, 2025, the City Council approved the City’s 2025 Sewer System Management Plan <br />(SSMP), a living document required by the State Water Resources Control Board (SWRCB) <br />that provides the framework for managing the sewer program. The SSMP identified the need <br />for the City to establish a complete and comprehensive sewer management program that <br />supports required operations and maintenance (O&M), repair and replacement (R&R), and <br />capital improvement program (CIP) projects to meet the minimum State requirements for <br />effective sewer system management and to maintain compliance with all sanitary sewer <br />regulatory requirements. As required in the SSMP, the City developed a long-term sewer CIP <br />identifying critical infrastructure needs over the next 20 years, which the City Council approved <br />on November 4, 2025. <br /> <br />To support financial sustainability during SSMP implementation, the City retained a utility rate <br />consulting firm, Water Resources Economics, LLC (WRE), to prepare the 2026 Sewer Rate <br />Study. The Rate Study will develop cost-based, fair, and legally defensible sewer rates and <br />connection fees that adequately fund the sewer program. <br />Page 339 of 617