My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULA MEETING AGENDA PACKET _Revised_ 6-2-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
CITY COUNCIL REGULA MEETING AGENDA PACKET _Revised_ 6-2-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2026 2:56:22 PM
Creation date
5/29/2026 2:52:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2306 <br />Page 17 of 35 <br />Page 17 of 35 <br /> <br />The City is located in Zone 7, and its storm drain pipe network is considered a <br />secondary facility. Any additions or upgrades to the City’s pipe network shall be <br />designed in accordance with the manual. Calculations submitted for review/approval <br />shall be presented in a format consistent with the “Calculation Form – District Rational <br />Method” available in the manual. Said calculations shall be prepared, stamped, and <br />signed by a California-licensed civil engineer. (Address this condition prior to <br />improvement plan approval). <br /> <br />51. EMERGENCY OVERLAND STORMWATER FLOW/SUMP PROPERTIES: All <br />properties shall be designed with an emergency overland flow path to direct storm <br />runoff to the nearest public street or open flood control facility in the event on-site pipes <br />become plugged. The flow path shall be lower than the finish floor elevation of all <br />habitable structures. The flow path cannot rely on neighboring properties unless a storm <br />drain easement across the neighbor is obtained. Sump properties must be designed to <br />discharge the 50-year recurrence interval storm event through the pipe network before <br />habitable structures become inundated. <br /> <br />52. STORM WATER ENERGY DISSIPATION. The drainage design relies on storm <br />discharges onto unprotected natural hillside slopes. To reduce erosion potential, the <br />storm drain system shall be designed to dissipate energy and reduce flow velocity to <br />less than 6 feet-per-second at the discharge end of all outfalls. (Address this condition <br />prior to improvement plan approval). <br /> <br />53. PRIVATE STORM DRAIN EASEMENTS. Private storm drain easements shall be <br />granted across the western portion of Lot 30 for the benefit of Lot 29 and Parcel C, and <br />across Lot 29 for the benefit of Parcel C. The easements shall assure that storm runoff <br />within Devany Creek can flow unobstructed across these properties to the Dublin <br />Canyon Road culvert. Maintenance of the creek shall be the obligation of each property <br />owner, unless this obligation is transferred to the homeowner’s association. (Address <br />this condition prior to subdivision map approval). <br /> <br />54. POTABLE WATER. The potable water distribution system within the subdivision shall <br />be designed in accordance with the Hydraulic Analysis prepared by Akel Engineering <br />Group dated June 2024, specifically “Alternative 3 – Moller 770 Connection”, although <br />Lots 29 and 30 shall be connected to the Dublin Canyon Pressure Zone. Said system <br />shall be publicly owned and maintained by the City. Appropriate Public Service <br />Easements shall be granted across roads and access pathways to allow maintenance <br />access to these facilities. (Address this condition prior to subdivision map approval). <br /> <br />The City’s Utility Division requires a water inter-tie on Dublin Canyon Road between the <br />Dublin Canyon Pressure Zone and the Moller 770 Pressure Zone so the subdivision <br />can be temporarily fed from the Dublin Canyon zone if service from the Moller zone <br />is interrupted. Final design and coordination of the inter-tie is subject to the Utility <br />Division review and comment during the permitting phase. (Address this condition prior <br />to plan approval). <br /> <br />Page 40 of 617
The URL can be used to link to this page
Your browser does not support the video tag.